New construction in Boston starts with the lot
Empty buildable lots are rare in Boston. Most new construction Boston homeowners take on is a rebuild: an old house comes down, or a garage or a side yard gets split off, and a new house goes up within the zoning rules for that district. In West Roxbury, Roslindale and Hyde Park that often means a tired ranch or Cape replaced by a larger single-family. Closer in, in neighborhoods like East Boston, Dorchester and South Boston, it more often means a two-family or a narrow single on a small lot.
Before you spend money on design, a few questions need answers:
- What zoning district and subdistrict is the lot in, and what do its setback, height and lot coverage rules allow?
- Is the existing building old enough to trigger Article 85 demolition review, or is it in a district where every building is reviewed?
- Is the lot in a flood zone, a historic district, or within 100 feet of a park or parkway?
- Where are the water, sewer, gas and electric connections, and are they large enough for a new house?
- Can a crane, concrete truck and dumpster reach the site on your street?
We help clients answer those before they buy a lot or commit to a teardown. If the answer to the first question is that the house you want needs zoning relief, the process includes a Zoning Board of Appeal hearing, and that changes the schedule more than anything else on this list.
Teardowns and Article 85 demolition review
Boston does not let a building come down just because the owner wants it gone. Article 85 of the zoning code sets up a demolition review run by the Boston Landmarks Commission. It applies to every building in the Downtown and Harborpark areas and in Neighborhood Design Overlay Districts, and to all other buildings at least 50 years old. Any house built before the mid-1970s already passes the 50 year mark, so a typical teardown candidate goes through it.
The process starts with an online application to the Landmarks Commission, which no longer takes paper or email applications. It needs photos keyed to a map, a property map, a plot plan, proof of ownership and a notarized signature page, plus plans and elevations if a new building is proposed. Within 10 calendar days of a complete application, staff decide whether the building is significant. If it is, the Commission schedules a public hearing within 30 days, and you present alternatives to demolition. The City describes the purpose as a waiting period to consider alternatives.
After Article 85, the demolition permit itself has a long checklist. You need shut-off notices from the gas, electric, telephone and cable companies, a closed general service agreement from the Boston Water and Sewer Commission, DEP approval for hazardous materials, a Dig Safe reference number, a letter from a pest control contractor covering pest management before and after the project, and a demolition permit from Boston Fire Prevention. We handle each of these. Utility shut-offs in particular take longer than most people expect, and the demolition cannot be scheduled until every one is done.
Permits for a new house
Boston’s new construction intake starts online and finishes in person at the Building Division at 1010 Massachusetts Avenue. The City asks for a total scope of work, a cost estimate covering labor and materials, and a complete set of plans stamped by a licensed professional. Zoning review gets its own copies: plot plans showing structures, parking and setbacks, stamped elevations and stamped floor plans. Building review gets two sets that include structural and sprinkler plans, fire alarm plans, electrical, plumbing, HVAC and energy plans, Boston Water and Sewer Commission plans, a signed agreement among the contractors showing cost and scope, and current licenses for all of them.
Two details catch new builders out. First, the foundation permit is separate. Boston issues it only after the main permit application is on file, and it calls for plans stamped by the Plans and Zoning Division, Boston Water and Sewer Commission approval, proof of work with a licensed rodent control exterminator, and a fee paid by bond, letter of credit or certified check. Second, Boston’s intake list asks for Home Improvement Contractor registration on one to two family projects. State HIC registration is written for work on existing owner-occupied homes, so this is a City paperwork point rather than a state licensing rule, but we bring it either way.
The Massachusetts State Building Code, 780 CMR 10th edition, took effect on October 11, 2024, and after a concurrency period that ended June 30, 2025, it is the only building code in effect. New houses are designed to it.
Boston’s Specialized energy code for new homes
This is the biggest change in Boston custom homes over the past few years. Boston adopted the Massachusetts Municipal Opt-in Specialized energy code effective January 1, 2024, according to the Department of Energy Resources. As of October 2026, DOER counts 61 municipalities on the Specialized code, including Brookline, Cambridge, Newton, Somerville and Milton. Others nearby, such as Quincy, use the stretch code instead. If you are weighing lots in different towns, the energy code is part of the comparison.
Under the Specialized code (225 CMR 22.00, Appendix RC), a new residential building has to be a Net Zero Building. In practice, the house must:
- Meet the stretch code efficiency requirements
- Include EV-ready wiring under the code’s electric vehicle section
- Comply through either Passive House certification or a HERS (Energy Rating Index) rating
- Follow one of three pathways: zero energy, all-electric, or mixed fuel
The zero energy pathway pairs an efficient house with enough on-site renewable energy to cover its annual use. The all-electric pathway, as the name says, runs the house on electricity instead of fossil fuels. The mixed-fuel pathway allows gas or another fossil fuel, but the house must be fully pre-wired for future electrification and must generate solar power on site from its available solar zone. New homes over 4,000 square feet of conditioned floor area cannot use the mixed-fuel pathway at all.
These choices shape the design early. An all-electric house needs heat pumps sized to a tight, well-insulated envelope, which means the air sealing and insulation have to perform as drawn. A mixed-fuel or zero energy house needs roof area and orientation for solar, which affects the roof design. Any of them can change the size of the electrical service. We bring the HERS rater in during design so the testing at the end confirms what the drawings promised.
Foundations, flood zones and Boston soil
The Massachusetts residential code sets the frost line depth at 48 inches, so footings for a new house go below that. Frost protected shallow foundations are allowed under their own section of the code, and the engineer picks the foundation type for the house and the site.
Waterfront neighborhoods add a layer. The residential code’s design criteria point to its flood hazard section (R322) for buildings in flood zones, and in a mapped flood zone the floor elevation, foundation type and location of mechanical equipment all follow those rules. For anyone looking at East Boston new construction, or a lot in South Boston, Charlestown or Dorchester near the water, we check the flood maps before design starts.
Soil conditions also vary from lot to lot. A geotechnical investigation tells the structural engineer what the foundation has to bear on. That report is cheap compared with redesigning a foundation after excavation starts.
How new home construction in Boston goes together
Once the permits are issued, the build follows a predictable order, and knowing it makes the schedule easier to follow.
Site work and demolition come first. The old house comes down after every utility is cut off, the lot is cleared, and erosion control and fencing go up. On a tight Boston street, we also plan where trucks stand and where materials get stored, because there is rarely room for both.
The foundation is next. Excavation, footings below the frost line, foundation walls, waterproofing, drainage and the inspection that has to pass before backfill. New water and sewer connections are usually made in this phase too, under the Boston Water and Sewer Commission approvals.
Framing, roof and windows close the house in. This is when the shape of the building becomes real, and when the air barrier gets built. On a Specialized code house, the air barrier details at windows, roof edges and rim joists matter more than almost anything else, because the final test measures them.
Rough mechanical, electrical and plumbing work goes in next, including heat pump line sets, ventilation ducts, EV-ready circuits and, where the pathway calls for it, conduit for solar. Inspections follow each trade before walls close.
Insulation, the HERS rater’s pre-drywall check where the rating path requires it, drywall, and then interior finishes: flooring, cabinets, tile, trim and paint. Outside, siding, decks and grading happen in parallel.
The end of the job is testing and sign-off. The HERS rater runs the final tests, and the City’s inspectors do their final inspections before you move in. We walk the house with you room by room before that last inspection, so the punch list gets done while the crews are still on site.
Building with your architect, or ours
Clients come to us in two ways. Some already have an architect and a design, and they need a builder to price it, value-engineer it with the architect, and build it. Others have a lot and an idea, and they want one team from the start. For them, we run the project as design-build, with an architect and engineer we work with regularly.
Either way, we start pricing during design, not after it. Custom home costs in Boston depend on factors we can name early: demolition and Article 85 review, utility work, foundation type and soil, the energy code pathway, the size and number of baths and kitchens, window and siding choices, and site access. When a client also wants a separate unit on the lot, we plan it alongside the main house (see our ADU builder page for Boston’s ADU rules).
What to ask a custom home builder: Boston specifics
When you interview custom home builders Boston homeowners recommend, ask:
- Who holds the Construction Supervisor License for the job, and is it an unrestricted or one and two family license? Look it up on mass.gov.
- How many Article 85 reviews and Boston demolition permits has the team handled, and what held them up?
- Which energy code pathway do they suggest for your house, and why? Who is the HERS rater?
- Who on their team handles Boston Water and Sewer Commission approvals and utility connections?
- How do they handle allowances, change orders and the payment schedule? Get it all in writing.
- Who runs the site day to day, and how often will you meet?
We answer all of those in writing before you sign.
Where we work
We build custom homes in Boston neighborhoods and in towns across Greater Boston and eastern Massachusetts. For new construction outside the city, see our custom homes in Massachusetts page. If you own a lot or a house you are thinking of replacing, contact us with the address and we will start with what the lot allows.
How a custom homes project works with us
Call or request an estimate
Tell us what you need and roughly when.
On-site visit
We look at the space, measure and talk through options.
Written estimate
A clear scope, price and schedule, line by line.
Permits & build
We file permits, do the work, pass inspections and walk it through with you.
Custom Homes across Massachusetts
See our home builder massachusetts page for work outside Boston.
- Custom Home Builder Barnstable Massachusetts: Planning a New House by Village and Lot
- Custom Home Builder Cambridge MA: New Houses on Old City Lots
- Custom Home Builder Chatham MA for New Houses on Older Lots
- Custom Home Builder Dennis MA: Replacing a House Across Five Villages
- Custom Home Builder Falmouth Massachusetts: What Chapter 235 and the Districts Mean for Your Lot
- Home Building Contractor Foxborough MA: Lots, Codes and Permits for a New House
- Custom Home Builder Milton MA: Zoning, Teardowns and the Specialized Code
- New Construction Plymouth MA: Building a Custom Home on Your Lot
- Custom Home Builder Sandwich Massachusetts: New Houses North and South of Route 6
- Home Builder Waltham MA: Teardown Review, Energy Code and Permits
- Custom Home Builder Woburn MA: New Homes and Teardown Rebuilds
- Custom Home Builder Yarmouth MA for New Houses on Established Streets
Custom Homes questions
Can I tear down an old house in Boston and build a new one?
Often, yes, but there are steps. Buildings at least 50 years old, and all buildings in Downtown, Harborpark and Neighborhood Design Overlay Districts, go through Article 85 demolition review. Staff decide within 10 days of a complete application whether the building is significant. A significant building gets a public hearing, scheduled within 30 days, where you present alternatives to demolition.
Do new homes in Boston have to be all-electric?
Not strictly. Under the Specialized energy code in effect in Boston since January 1, 2024, a new home can use a zero energy, all-electric or mixed-fuel pathway. Mixed fuel requires the house to be fully pre-wired for future electrification and to generate solar power on site, and new homes over 4,000 square feet of conditioned floor area must use the zero energy or all-electric pathway.
Does a new house need a HERS rating?
Under the Specialized code, new residential buildings must comply with either the Passive House section or the HERS (Energy Rating Index) section, plus EV-ready wiring, along with one of the three pathways. On the HERS route, a HERS rater is part of the team from design through final testing.
Is my contractor required to be a registered Home Improvement Contractor for a new house?
State HIC registration applies to work on an existing, owner-occupied home of one to four units, so brand-new construction falls outside it. Boston's new construction intake list still asks for HIC registration on one to two family projects, so expect to show it there.
What has to happen before demolition day?
Boston's demolition permit checklist includes Article 85 approval, shut-off notices from the gas, electric, phone and cable utilities, a closed general service agreement from the Boston Water and Sewer Commission, DEP approval for hazardous materials, a Dig Safe number, a pest control letter and a Boston Fire Prevention permit.
Do you build in East Boston and other waterfront neighborhoods?
Yes. On lots near the water we check flood maps before design, because the residential code points to its flood hazard section for buildings in flood zones, and it affects foundation type, floor elevation and where the mechanical equipment goes.
Sources
Facts on this page were last checked against these sources on November 14, 2026.
- City of Boston, How to get a new construction permit (accessed 2026-11-14)
- City of Boston, How to get a demolition permit (accessed 2026-11-14)
- City of Boston, How to file for Article 85 demolition review (accessed 2026-11-14)
- City of Boston, How to get a foundation permit (accessed 2026-11-14)
- Mass.gov DOER, Massachusetts building energy code adoption by municipality (Boston Specialized code effective 1/1/2024) (accessed 2026-11-14)
- Mass.gov DOER, 225 CMR 22.00 residential Stretch and Specialized code (2025), Appendix RC (accessed 2026-11-14)
- Mass.gov DOER, Massachusetts building energy codes (10th edition effective dates) (accessed 2026-11-14)
- Mass.gov, 780 CMR 10th edition residential code, Chapter 3 amendments (frost line depth 48 inches, flood hazards R322) (accessed 2026-11-14)
- Mass.gov, Learn about different Construction Supervisor Licenses (accessed 2026-11-14)
- Mass.gov, HIC contractor resources (Do I need to register as a Home Improvement Contractor?) (accessed 2026-11-14)