Woburn is a Middlesex County city of 40,876 people as of the 2020 Census, part of the Metropolitan Area Planning Council’s North Suburban subregion. It is also one of the older communities in New England. The city’s history page dates settlement to 1640 and incorporation to October 7, 1642, and notes that colonial Woburn once included what are now Wilmington, Burlington and Winchester.
Woburn MA construction services and the houses they work on
The city says virtually all the historic architectural styles typical of New England can be found in Woburn. It points to the Baldwin Mansion, built in 1661 and given its Federal-era look in 1803, and to the Woburn Public Library, the first public library designed by H. H. Richardson and a National Historic Landmark since 1987. Most homes are far younger than those landmarks, though.
Census estimates for 2020 to 2024 put Woburn’s median year built at 1968. The spread across eras is fairly even:
- 18.7 percent of housing units were built before 1940
- 22.7 percent from 1940 to 1959
- 21.2 percent from 1960 to 1979
- 23.8 percent from 1980 to 1999
- 13.6 percent in 2000 or later
So a contractor here works on pre-war houses and on homes built in the last 25 years, whether the job is in North Woburn, Central Square or South Woburn. Roughly 62.6 percent of units predate 1980, which means lead-safe rules apply to a lot of renovation work. Our Massachusetts lead paint law guide covers the thresholds.
Housing types are mixed too. Single-family detached houses make up 46.5 percent of units, attached single-family homes 9.1 percent, two-unit buildings 13.0 percent and three or four unit buildings 6.3 percent. A full quarter, 25.0 percent, are in buildings with five or more units. That last group matters for owners of condos in larger buildings: Home Improvement Contractor protections apply only to owner-occupied homes of one to four units.
Permits from Inspectional Services
Woburn’s Inspectional Services Department issues building permits, and its page lists the usual triggers: new structures, additions, dormers, chimneys, decks, roofing, siding, swimming pools, wood stoves, antennas and sheds. Ordinary repairs are the stated exception, and the office suggests calling a building inspector when it is unclear. Plumbing, gas and electrical permits are the responsibility of the licensed plumber and electrician.
A few local details are worth knowing:
- Work cannot begin until the permit is issued. Starting without one means the permit is still required and the fee doubles.
- Title 15 of the Municipal Code sets residential building permit fees at $15 per $1,000 of estimated construction value with a $50 minimum, and the same rate applies to re-roofing, siding and open decks. A $50 reinspection fee applies when work is not ready.
- The state building code allows up to 30 days to issue or deny a permit, and the city says simple projects can take as little as one day.
- The office is open until 7:00 p.m. on Thursdays and closes at 1:00 p.m. on Fridays.
- The city will not recommend contractors, but it keeps a list of permits issued that includes contractor names.
Historic review, demolition delay and wetlands
Three local ordinances shape bigger projects here.
The Historic District Commission, under Title 19, oversees the Baldwin Homestead Historic District (2004) and its 2009 expansion. In those districts, exterior changes visible from a public way need a certificate before the city will issue a building or demolition permit.
The demolition delay ordinance in Title 15 applies citywide. Any building that is 75 years or older, in whole or in part, goes through Historical Commission review before a demolition permit issues, and a building of unknown age is assumed to be older than 75. If the commission finds it significant and, after a hearing, Preferably Preserved, the delay is 12 months. The ordinance also requires owners of significant buildings to keep roofs, siding, windows and doors weather tight. Anyone planning demolition in Woburn should start this review first. Interior-only demolition permits are excluded.
The wetlands ordinance in Title 7, rewritten in May 2026, protects wetlands, flood prone areas and land within 150 feet of a wetland. The ordinance defines altering land broadly, including changes in grade, removal of trees and construction of buildings or structures of any kind, so additions, new homes and sheds near a stream or wetland can need a Conservation Commission permit. Title 13 adds stormwater rules for new development and redevelopment.
Energy code and ADUs
DOER’s adoption list shows Woburn on the Stretch Energy Code since January 1, 2012. That matters most for new homes and additions. See our energy code guide.
Section 35 of the Zoning Ordinance, added May 27, 2025, allows attached or detached ADUs by right in the R1, R2, R3, R4 and S1 zones. A detached unit must sit at least 5 feet from the main house, one off-street space is required unless the lot is within half a mile of a transit station, short-term rental is prohibited, and a second ADU needs a special permit. Our ADU builder page explains the state law behind it.
Services we offer in Woburn
City-specific guides:
We also handle painting, insulation and drywall, masonry and concrete, home additions and siding. The state chart helps when you compare bids. House painting services Woburn MA homeowners hire need HIC registration for exterior painting but not for interior work. Insulation contractors Woburn MA residents call, including for cellulose insulation, need an insulation Construction Supervisor License at minimum, a building permit and HIC registration. For masonry, Woburn MA projects tied to the building need a masonry license at minimum, and demolition in Woburn MA needs at least a demolition license on top of the delay review.
Statewide rules are on our Massachusetts general contractor page. When you are ready, tell us about your Woburn project.
Popular projects in Woburn
Bathroom Remodeling Woburn MA: From Small Baths to New Suites
Gut bathroom renovations, tub-to-shower conversions and accessible baths, waterproofed and vented the right way.
Learn more →Custom Home Builder Woburn MA: New Homes and Teardown Rebuilds
New custom homes and teardown rebuilds built to Boston's energy code.
Learn more →Kitchen Remodeling Woburn MA: Layout, Permits and Trades
Full kitchen renovations in Boston homes and condos, from new layouts and cabinets to permits and licensed trades.
Learn more →Roofing Woburn MA: Replacement and Repair for Homes and Condos
Roof replacement, repair, flat roofs, slate and copper for Boston homes.
Learn more →Vinyl Siding Woburn MA: Permits, Fees and What Each Era of House Needs
Fiber cement, vinyl, cedar shingle and clapboard siding, replaced or repaired, with the weather barrier done right.
Learn more →Woburn neighborhoods we serve
- North Woburn
- Central Square
- South Woburn
Other services in Woburn
- Commercial Roofing
- Basement Finishing
- Basement Waterproofing
- Home Additions
- ADU Builder
- Windows & Doors
- Decks & Patios
- Masonry & Concrete
- Painting
- Flooring & Tile
- Carpentry & Repairs
- Drywall & Insulation
- Whole-Home Renovation
- Design-Build
- Commercial Construction
- Gutters & Exterior Trim
Frequently asked questions
Where do I get a building permit in Woburn?
From the Inspectional Services Department, which takes applications at City Hall and posts forms on the city website. The office is open until 7:00 p.m. on Thursdays and closes at 1:00 p.m. on Fridays. Licensed plumbers and electricians file their own permits.
What happens if work starts without a permit in Woburn?
The city's Inspectional Services page says the permit is still required and the fee is doubled. The city's ordinance also says activity started without a permit is subject to the enforcement actions allowed under the state building code.
How long does a Woburn building permit take?
Woburn's page notes that the state building code allows up to 30 days to issue or deny a building permit, and that simple projects can be approved in as little as a day.
Can I tear down an old house in Woburn?
Possibly, but not right away if it is 75 years or older. The Historical Commission decides within 15 business days whether the building is significant. If it is, a public hearing follows, and a building found Preferably Preserved cannot be demolished for 12 months unless the commission agrees otherwise.
Do I need Conservation Commission approval?
If the work is in a wetland, a flood prone area or within 150 feet of a wetland, Woburn's ordinance requires a permit before work starts. You can ask the commission in writing for a determination, and it must respond within 21 days.
Can I add an accessory dwelling unit in Woburn?
In the R1 through R4 and S1 zones, one ADU is allowed by right under Section 35 of the Zoning Ordinance. A second ADU on the same lot needs a special permit from the Board of Appeals, and the maximum is two per lot.
Sources
Facts on this page were last checked against these sources on November 16, 2026.
- City of Woburn, Inspectional Services (accessed 2026-11-16)
- City of Woburn, Municipal Code Title 15, Buildings and Construction (permit fees and demolition delay) (accessed 2026-11-16)
- City of Woburn, Municipal Code Title 7, Wetlands Protection and Conservation (amended May 2026) (accessed 2026-11-16)
- City of Woburn, Municipal Code Title 19, Historic District Commission (accessed 2026-11-16)
- City of Woburn, Historical Commission (accessed 2026-11-16)
- City of Woburn, History of Woburn (accessed 2026-11-16)
- City of Woburn, Zoning Ordinance Section 35, Protected Use Accessory Dwelling Units (accessed 2026-11-16)
- City of Woburn, Municipal Code Title 13 table of contents (stormwater, Section 13.4) (accessed 2026-11-16)
- US Census Bureau, ACS 2020 to 2024 5-year, B25034 year structure built (accessed 2026-11-16)
- US Census Bureau, ACS 2020 to 2024 5-year, B25035 median year structure built (accessed 2026-11-16)
- US Census Bureau, ACS 2020 to 2024 5-year, B25024 units in structure (accessed 2026-11-16)
- US Census Bureau, 2020 Census redistricting data (PL 94-171), Massachusetts (accessed 2026-11-16)
- MAPC, North Suburban Planning Council FY27 work plan (accessed 2026-11-16)
- Mass.gov (DOER), Municipal Energy Code List (CSV, November 3, 2026) (accessed 2026-11-16)
- Mass.gov, HIC Contractor Resources (CSL, HIC and building permit chart) (accessed 2026-11-16)