Flooring Boston: Hardwood, Tile and Vinyl Plank Over a Flat Subfloor

Flooring Boston homes have been living with for a century usually has three problems stacked on top of each other. There is a newer floor over an older one, the subfloor underneath has humps and dips, and the joists below have been cut for pipes at some point. We install and repair hardwood, engineered wood, tile and luxury vinyl plank, and most of our work on any floor happens before the first board goes down.

Flooring Boston houses already have underneath

Pull up a corner of carpet in a Dorchester triple-decker or a Jamaica Plain Victorian and you will often find narrow oak or fir strip flooring, nailed over board sheathing that runs on the diagonal. Under kitchen and bath floors there may be two or three generations of vinyl or linoleum, each glued to the one before it, sometimes with a layer of luan plywood in between. Back Bay and South End rowhouses can have wide pine boards on the upper floors and a mix of everything on the parlor level. Postwar capes in West Roxbury and Hyde Park tend to have oak over plywood or planks, which is a much easier starting point.

Knowing what is down there decides the whole job. It tells us whether the old floor can be saved, whether new flooring can go over it, what has to be tested before anyone tears it out, and how much leveling the subfloor will need.

What we do:

  • Solid hardwood installation, usually oak or maple, unfinished and sanded on site or prefinished
  • Engineered hardwood where solid wood is a poor fit, such as over radiant heat or on a concrete slab
  • Hardwood floor repair: replacing damaged boards, weaving in patches where walls came out, and matching species and width
  • Porcelain, ceramic and natural stone tile on floors and walls
  • Luxury vinyl plank and tile for basements, rentals and kitchens
  • Stair treads, risers, nosings and transitions between rooms
  • Epoxy and other coatings for garage and basement slabs
  • Subfloor repair, leveling and joist reinforcement

The subfloor decides whether the floor stays flat

A new floor only stays flat and quiet if the structure under it is. In century-old Boston houses it frequently is not.

We start with a long straightedge and a laser. Dips of a quarter inch over a few feet are common, and so are humps over a beam or a bearing wall where the rest of the floor has sagged around it. Then we look from below when we can: sagging joists, joists notched or drilled for old plumbing, a cracked beam in the basement, missing blocking. Squeaks usually come from loose sheathing or nails rubbing in old boards, and they get fixed before new flooring covers them up.

How we fix it depends on what we find:

  1. Small dips get feathered out with leveling compound or shims under new plywood.
  2. Loose or rotted sheathing gets screwed down or replaced.
  3. Notched or cracked joists get sistered with new lumber or reinforced.
  4. A floor that slopes because a beam or post has settled needs that support addressed first, which can be a separate structural job.

Boston’s Short Form permit covers minor repairs and replacements that do not change a building’s structure. When the floor needs real structural work, we sort out with Inspectional Services which permit applies before the work begins.

Hardwood floors Boston houses are built around

Solid hardwood is still the floor most people want in living rooms, dining rooms and bedrooms here. Strip oak is the usual match for Boston houses built before the war. For new installations we use either unfinished boards sanded and finished in place, which lets us match an existing floor and gives a flat surface across the room, or prefinished boards, which go in faster with no on-site finishing smell.

Wood moves with the seasons. It shrinks in winter when the heat is running and the air is dry, and swells in humid summers. We check the moisture content of both the new flooring and the subfloor with a meter, let the wood sit in the house before installing it, and follow the manufacturer’s instructions for gaps at walls. Small seasonal gaps between boards in February are normal in a heated New England house and usually close up by summer.

Hardwood floor repair is a big part of what we do in older homes. When a wall comes out in a renovation, there is a strip of missing floor where it stood. When a radiator leaks for years, boards cup and rot around it. We take out the damaged boards, lace in new or salvaged ones in a staggered pattern so there is no straight seam, and sand and finish the whole room so the patch disappears. Matching species, width and age color is the hard part, and sometimes salvaged boards from a closet are the best source.

Stairs deserve their own mention. Old Boston stairs are often painted or carpeted oak or fir, worn into a dip at the center of each tread, with nosings that have split over the years. We can sand and refinish treads that still have enough wood, replace treads and risers one at a time, or cap them with new hardwood treads. Each stair is measured and cut separately, because no two steps in a hundred-year-old staircase are quite the same size. Painted stairs in a pre-1978 house also bring the lead rules below into play.

Engineered wood, laminate and vinyl plank

Engineered hardwood is a real wood surface layer over a plywood or composite core. It is more stable than solid wood, which makes it the safer choice over a concrete slab, over radiant floor heat and in some condos where the building’s rules dictate a floating floor with sound underlayment.

Laminate and luxury vinyl plank imitate wood with a printed layer. Vinyl plank shrugs off water and is a strong choice for basements, rental units and busy kitchens. Laminate is harder wearing on the surface but does not like standing water. Both need a flat subfloor, because they show every bump underneath.

Many engineered and laminate products use plywood or fiberboard in the core. The EPA’s formaldehyde emission standards cover hardwood plywood, medium-density fiberboard and particleboard, along with finished goods that contain them, and those products must be labeled TSCA Title VI compliant. Check the box or ask the supplier before buying.

In basements, moisture is the main enemy. The EPA recommends keeping indoor relative humidity below 60 percent, and ideally between 30 and 50. We test the slab before choosing a product, and if water is coming through the walls or floor, that gets solved first through our basement waterproofing work.

Tile installation: Boston kitchens, baths and entries

Tile is unforgiving. Grout cracks and tiles pop when the floor under them flexes, and an older wood-framed floor flexes more than people think. The more rigid the floor, the bigger and harder the tile it can carry. Natural stone and large-format porcelain need a stiffer floor than small ceramic tiles do.

For a tile floor over wood framing we stiffen the floor if needed, add a layer of plywood or cement board, and often use an uncoupling membrane between the substrate and the tile to absorb movement. Large tiles need a very flat surface or they end up with lips at the edges, so we level first and use a lippage system during installation. Movement joints at the edges of the room and at changes of plane keep the tile from tenting in the first warm week of spring.

Where tile meets water, as in a shower or tub surround, it sits over a waterproofing system. That is covered on our bathroom remodeling page. For a backsplash, the work is mostly about layout: centering on the range or window, planning where outlets land and finishing exposed edges cleanly. Our kitchen remodeling page covers how that fits into a full kitchen job.

Old flooring that has to be tested first

This is the part of a flooring job that cannot be skipped in an older Boston home.

MassDEP lists resilient flooring and mastics, the adhesives under it, among the building materials where asbestos can turn up, along with joint compound, plaster and pipe insulation. MassDEP’s disposal guidance even names vinyl asbestos tile specifically. Old square vinyl tiles, older sheet goods and the adhesive under them are the usual suspects. The EPA’s guidance is direct: leave asbestos-containing material alone if it is in good condition, do not sand or try to level asbestos flooring or its backing, never use a power stripper on it, and where possible lay new flooring over the old floor instead of tearing it out. The EPA also recommends having a trained professional take samples, not doing it yourself.

If testing shows asbestos and the floor has to come out, Massachusetts requires notice to both MassDEP and the Department of Labor Standards at least 10 working days before the abatement starts, and the Department of Labor Standards requires that notice to be filed by a licensed asbestos abatement contractor. Abatement is its own licensed trade. When a floor tests positive, a licensed abatement company removes it, and we schedule our work around their notification period.

Lead is the other issue. Painted stairs, painted porch floors and every baseboard in a pre-1978 house can contain lead paint. Massachusetts requires paid renovation work in pre-1978 homes that disturbs more than 6 square feet of painted surface per room to be done by a licensed lead-safe renovation contractor, with a certified supervisor on site whenever the work is in progress. Pulling baseboards to install a new floor in a few rooms crosses that line quickly.

Epoxy flooring: Boston garages and basements

Epoxy and similar coatings make sense on concrete: garages, basement utility areas, workshops. They resist oil and salt, clean easily and brighten a dark basement. The coating is only as good as the prep. Concrete has to be ground or etched so the coating can bond, cracks repaired, and the slab dry enough. A coating over a slab that pushes moisture up will peel, which is why we check that first.

For storefronts, offices and other light commercial flooring, Boston businesses can work with our commercial construction group, which handles the scheduling and building requirements that come with a business space.

Hiring flooring contractors: Boston homeowner checklist

Flooring is a trade where the problems show up a year later, so it pays to ask about the work you cannot see:

  • How will you check the subfloor for flatness, and what do you do if it is out?
  • Will you test the moisture of the wood and the subfloor before installing?
  • What happens to the old flooring? If it might contain asbestos, who tests it?
  • For a pre-1978 house, do you hold a Massachusetts lead-safe renovation license?
  • Is everything in a written contract with the materials, dates and payment schedule listed? Massachusetts requires that for home improvement contracts over $1,000, and limits any deposit to one third of the price unless special-order materials cost more.

What affects the cost of a new floor

Square footage matters less than people expect. The bigger factors are:

  • How many old layers come up, and whether any need asbestos testing or abatement
  • How much leveling the subfloor needs, and whether the framing needs reinforcement
  • Material: solid or engineered hardwood, tile, vinyl plank or epoxy
  • Sand-and-finish on site versus prefinished boards
  • Patching and weaving into existing floors
  • Stairs, which are slow, detailed work
  • Moving furniture, condo elevator access and how far material has to be carried

Where we work

We install floors in homes across Boston, from Charlestown and the North End to Dorchester, Mattapan and Hyde Park, and in the surrounding cities and towns. See our Massachusetts service area for the towns we cover outside the city, or contact us to have us look at your floors.

How a flooring & tile project works with us

  1. Call or request an estimate

    Tell us what you need and roughly when.

  2. On-site visit

    We look at the space, measure and talk through options.

  3. Written estimate

    A clear scope, price and schedule, line by line.

  4. Permits & build

    We file permits, do the work, pass inspections and walk it through with you.

Flooring & Tile across Massachusetts

Flooring & Tile questions

What flooring works best in a Boston basement?

Luxury vinyl plank and porcelain tile, over a dry slab. Both tolerate the moisture that comes through basement concrete far better than solid hardwood. Before any floor goes in we look for signs of water coming in, because no flooring fixes a wet basement. Our basement waterproofing page covers that side of it.

Can you install new flooring over my old vinyl or linoleum?

Often, and sometimes it is the better choice. Older vinyl tile, sheet vinyl and the adhesive under them can contain asbestos. The EPA's advice is to leave asbestos flooring alone if it is in good condition and, where possible, to cover it with new flooring instead of tearing it out. If it has to come up, it gets tested first and removed by a licensed abatement contractor.

Can old hardwood floors in a triple-decker be saved?

Usually. Many Boston triple-deckers and Victorians have oak or fir strip floors hiding under carpet. If the boards are thick enough to sand and the damage is limited to a few spots, we patch in matching wood and refinish. If they have been sanded many times or have large water-damaged areas, new flooring may make more sense.

Why are my floors so uneven?

In older Boston houses it is usually the framing, not the flooring. Joists sag over a century, beams settle, and earlier plumbers notched joists to run pipes. We find the cause first, then flatten the subfloor or reinforce the framing before installing new flooring, so the new floor does not just follow the old dip.

Is luxury vinyl plank a good choice for a rental unit?

For many landlords, yes. It is water resistant, quick to install and easy to replace one plank at a time. It does need a flat subfloor, since it telegraphs bumps underneath, and in condos the association may have rules about underlayment for sound.

Do you do tile in showers too?

Yes, but a shower is a waterproofing job before it is a tile job. Our bathroom remodeling page explains how we build the shower assembly under the tile.

Sources

Facts on this page were last checked against these sources on November 14, 2026.

  1. Mass.gov, MassDEP asbestos, construction and demolition notifications (accessed 2026-11-14)
  2. Mass.gov, File an AQ 04 (ANF-001) asbestos removal notification (accessed 2026-11-14)
  3. U.S. EPA, Protect your family from exposures to asbestos (accessed 2026-11-14)
  4. Mass.gov, Lead-safe renovation for homeowners (accessed 2026-11-14)
  5. U.S. EPA, Formaldehyde emission standards for composite wood products (accessed 2026-11-14)
  6. U.S. EPA, A brief guide to mold, moisture and your home (accessed 2026-11-14)
  7. City of Boston, How to get a Short Form permit (accessed 2026-11-14)
  8. Mass.gov, Home improvement contract sample language (required contract terms) (accessed 2026-11-14)