New houses are a real share of Woburn’s stock. Census estimates for 2020 to 2024 show 13.6 percent of the city’s housing units built in 2000 or later, and another 23.8 percent from 1980 to 1999. At the same time, 18.7 percent predate 1940. That mix is what most custom home projects here look like: either a vacant or subdivided lot, or an older house that comes down so a new one can go up.
What a custom home builder Woburn MA owners hire checks first
Before design, we look at four things on any Woburn lot:
- The age of any existing building, because that decides whether demolition review applies.
- Distance to any wetland, brook, pond or flood prone ground, because that decides whether the Conservation Commission gets involved.
- How much earth has to come out for the foundation and driveway, because Woburn asks that question on the permit application.
- The zoning district, which sets what can be built and whether an accessory unit is allowed by right.
Each of those has its own clock, and the slowest one sets the schedule.
Teardowns and the 75-year rule
Woburn’s demolition delay ordinance, in Title 15 of the Municipal Code, applies to any building that is 75 years or older in whole or in part. If the age is unknown, the ordinance assumes it is older than 75. Here is the sequence:
- You file a demolition application with the Building Commissioner, including photos, the reason for demolition and a description of what will replace the building.
- The commissioner forwards it to the Historical Commission within 7 business days.
- The commission has 15 business days to decide whether the building is significant. Criteria include National Register listing or eligibility, association with important people or events, and architectural importance.
- If it is significant, a public hearing must be held within 45 days of the complete application, with newspaper notice paid for by the applicant.
- If the commission then finds the building Preferably Preserved, no demolition permit can issue for 12 months, unless the commission agrees otherwise or is satisfied that real efforts to find a buyer who would preserve it have failed.
A building permit issued only for interior demolition is not covered. For a teardown, though, we file the demolition application early, often while design is still underway, so a delay does not land after you have closed on financing.
Wetlands, the 150-foot zone and stormwater
Woburn adopted its own wetlands ordinance under home rule, separate from the state Wetlands Protection Act, and rewrote it in May 2026. Title 7 protects wetlands, marshes, bogs, vernal pools, banks of streams and ponds, land subject to flooding, and any land within 150 feet of a wetland. Its definition of altering land is broad. It includes removing soil, changing drainage, placing fill that changes grade, cutting and removing trees, and building of any kind.
For a new house, the practical points are:
- If you are unsure whether the lot is covered, you can ask for a written determination. The commission must issue it within 21 days.
- A permit application goes to every abutter, and copies go to the City Council clerk, Planning Board, Board of Health, City Engineer and Building Commissioner, who get 14 days to comment.
- The hearing must open within 21 days of a complete filing, and the commission acts within 21 days after it closes.
- The applicant carries the burden of proving the work will not harm the protected interests, and the commission can charge for outside consultants.
- Permits last three years, with one possible renewal of up to three years.
Title 13 adds stormwater management rules for new development and redevelopment, which can shape how drainage from roofs and driveways is designed on site.
Permits and soil removal
Woburn’s Inspectional Services issues the building permit for a new house, and licensed plumbers and electricians pull their own trade permits. Title 15 sets the residential fee at $15 per $1,000 of estimated construction value, with a $50 minimum, and says the final value is set using Means cost data or by the Building Commissioner.
One local rule matters a lot on sloped or ledge-heavy lots. Every Woburn building permit application has to state how much gravel, loam, fill or other earth will be removed, and the commissioner can refuse a permit if the amount is excessive for the size of the lot or the planned site work. We work out cut and fill during design so the number on the application holds up.
Historic districts and new construction
The Historic District Commission’s districts, the Baldwin Homestead Historic District and its 2009 expansion, cover a small area. New construction inside them needs a certificate first. Title 19 tells the commission to weigh the scale, shape and proportions of a new building against its lot and its neighbors, and it may impose setbacks beyond what zoning requires. The commission does not review interiors or anything not visible from a public way.
Energy code and licensing
Woburn has been on the Stretch Energy Code since January 1, 2012. DOER describes the Stretch Code as an opt-in code that emphasizes energy performance over prescriptive requirements, and new homes are where it has the most effect on design. Our energy code guide explains the tiers.
The person supervising construction should hold a Massachusetts Construction Supervisor License, unrestricted or one and two family. The state’s Home Improvement Contractor law does not cover new construction, so the contract should spell out payment schedule, change orders, allowances and warranty on its own terms.
Related reading
Cost factors are in our guide to the cost to build a house in Massachusetts. The custom homes hub and statewide custom homes page cover design and process, and design-build explains how we run a project from drawings through occupancy. City rules for other projects are on the Woburn page. If you have a lot or a teardown in mind, send us the address. Anyone choosing a home builder Woburn MA lots can actually support should start with the four checks above.
How a custom homes project works with us
Call or request an estimate
Tell us what you need and roughly when.
On-site visit
We look at the space, measure and talk through options.
Written estimate
A clear scope, price and schedule, line by line.
Permits & build
We file permits, do the work, pass inspections and walk it through with you.
More about custom home builder boston and custom homes across Massachusetts, or see every service we offer in Woburn.
Frequently asked questions
Can I tear down a house and build new in Woburn?
Often, but plan for review. Woburn's demolition delay ordinance applies to any building 75 years or older, and to buildings of unknown age. The Historical Commission decides within 15 business days whether it is significant. If it is, a hearing follows within 45 days of the complete application, and a Preferably Preserved finding blocks demolition for 12 months unless the commission agrees otherwise.
My lot is near a brook or wetland. What applies?
Woburn's wetlands ordinance covers land within 150 feet of a wetland, plus flood prone areas. New construction, grading and tree clearing there need a Conservation Commission permit. You can request a written determination first, and the commission must answer within 21 days.
How long is a Woburn wetlands permit good for?
Permits under Title 7 expire three years from issuance. The commission can renew one for up to three more years if you ask in writing before it expires.
Who should hold the license on a new house?
The person supervising construction should hold a Massachusetts Construction Supervisor License, either unrestricted or the one and two family license. HIC registration does not apply to new construction, so the CSL and your contract are the main checks.
Can I add an ADU to a new house in Woburn?
Yes, in the right zone. Section 35 of the Woburn Zoning Ordinance allows attached or detached ADUs by right in the R1, R2, R3, R4 and S1 zones. A detached unit must be at least 5 feet from the main house.
Sources
Facts on this page were last checked against these sources on November 16, 2026.
- City of Woburn, Municipal Code Title 15, Buildings and Construction (soil removal, permit fees, demolition delay) (accessed 2026-11-16)
- City of Woburn, Municipal Code Title 7, Wetlands Protection and Conservation (amended May 2026) (accessed 2026-11-16)
- City of Woburn, Municipal Code Title 19, Historic District Commission (accessed 2026-11-16)
- City of Woburn, Municipal Code Title 13 table of contents (stormwater, Section 13.4) (accessed 2026-11-16)
- City of Woburn, Inspectional Services (accessed 2026-11-16)
- City of Woburn, Zoning Ordinance Section 35, Protected Use Accessory Dwelling Units (accessed 2026-11-16)
- US Census Bureau, ACS 2020 to 2024 5-year, B25034 year structure built (accessed 2026-11-16)
- Mass.gov (DOER), Municipal Energy Code List (CSV, November 3, 2026) (accessed 2026-11-16)
- Mass.gov (DOER), Building Energy Code (accessed 2026-11-16)
- Mass.gov, Home Improvement Contractor Program (accessed 2026-11-16)
- Mass.gov, Learn about different Construction Supervisor Licenses (accessed 2026-11-16)