Roofing contractors Sharon MA owners hire should start with the address
Before anyone talks about shingle colors, look up where the house sits. Sharon’s Chapter 174 sets four local historic districts under the state’s Chapter 40C, and exterior work inside them goes through the Historic District Commission:
- District 1, drawn on a 1969 plan, takes in parcels along North Main Street and High Street, among them the Unitarian Church, the First Congregational Church and parsonage, the Dennett House and the Sharon Public Library.
- District 2 is Cobb’s Tavern at 41 Bay Road.
- District 3 covers the Charles R. Wilber School at 75 South Main Street and the Pleasant Street School and Kate Morrell Park at 21 South Pleasant Street.
- District 4, voted in at the May 2025 Town Meeting, is the William R. Mann House at 228 East Street.
If the roof is on one of those parcels, ask the commission before ordering materials. Section 174-5 gives it 50 days from the filing of an application for a certificate of appropriateness to decide, unless you agree in writing to more time. That is a real gap in the schedule, so we file before we book the crew.
Postwar roofs across Sharon
Most Sharon roofs are not in a district. They are on houses from the middle of the last century. The Census Bureau’s 2020 to 2024 estimates place 24.1 percent of units in 1940 to 1959, 24.0 percent in 1960 to 1979 and 28.7 percent in 1980 to 1999. With 82.7 percent of units detached houses, that adds up to many single family houses built before modern attic and roof standards. Houses of that era often have shallow pitches, long eaves and attic floors insulated to the standards of their day.
That combination shapes the job:
- Low slopes give meltwater more time to find a seam, so ice barrier coverage at the eaves matters. The Massachusetts residential code requires it, and on a shallow roof we often carry it farther up than the minimum.
- Older attics may have little air sealing at the top plates and ceiling penetrations. Warm air reaching the roof deck melts snow, which refreezes at the cold overhang and forms ice dams.
- Original ventilation may be a pair of gable vents. Balancing soffit intake with ridge exhaust usually means cutting in new vents during the tear-off.
- Plank sheathing on the oldest houses may need to be overlaid or replaced in spots before new shingles go on.
We tear off to the deck so each of those can be checked. Our ice dam prevention guide explains why air sealing comes first.
Attic work and Mass Save
Sharon does not appear on the state DPU list of municipal light plant towns. That means statewide Mass Save insulation and air sealing offers may be available, depending on your own electric and gas accounts. The best time to do that attic work is just before or alongside the new roof, when the insulation contractor can reach the eaves. Ask for the home energy assessment early so the schedules line up. Our Mass Save rebates guide explains how to start.
When a roof project becomes a demolition question
Most re-roofs never involve the Historical Commission. A bigger project can. Sharon’s demolition bylaw defines demolition as pulling down, destroying, removing or razing a building or any portion of it. It applies to significant buildings, which include any built 100 or more years before the application or of unknown age, anything on the National Register, and buildings in the commission’s inventory.
So if you own one of the 14.7 percent of Sharon homes built before 1940 and want to take off the roof structure to add a full second story, or remove an old ell to rebuild it, call the commission first. If it finds the building preferably preserved after a hearing, the demolition permit can wait at least 12 months. Demolishing without a permit can mean fines of up to $300 a day and a two-year bar on building permits.
The Specialized Code and new roof framing
Sharon has been on the Stretch Code since 2017 and on the Municipal Opt-in Specialized Code since January 1, 2025, according to the DOER list dated November 3, 2026. A straight re-roof does not change that. A new house, or a roof framed as part of an addition, is designed under the energy code that applies to that work, so insulation depth, ventilation and any rooftop equipment get planned with the framing.
Wetland buffers and staging
Sharon’s wetlands bylaw, Chapter 262, adopted in 2018, covers a 100-foot buffer zone around resource areas, a 100-foot boundary around vernal pools and a 200-foot riverfront area along rivers and streams. A re-roof does not change the footprint, but dumpsters, delivery trucks and a week of ground work do touch the yard. On lots that back onto a brook or a wet area, we keep the container and stock on the driveway side and sweep for nails across the whole site.
Hiring checklist
If you own and live in a one to four unit home, hire a registered Home Improvement Contractor and get the contract in writing for any job over $1,000. Ask who holds the Construction Supervisor License for the permit. For costs, see our roof replacement cost guide and statewide roofing page. The Sharon overview covers other projects, and you can contact us with the address and the year your house was built.
How a roofing project works with us
Call or request an estimate
Tell us what you need and roughly when.
On-site visit
We look at the space, measure and talk through options.
Written estimate
A clear scope, price and schedule, line by line.
Permits & build
We file permits, do the work, pass inspections and walk it through with you.
More about roofing contractors boston and roofing across Massachusetts, or see every service we offer in Sharon.
Frequently asked questions
Do I need Historic District Commission approval to re-roof in Sharon?
Only if the house is in one of the four local districts in Chapter 174, which cover parcels on North Main and High Streets, Cobb's Tavern on Bay Road, the Wilber and Pleasant Street schools, and 228 East Street. Inside them, ask the commission before choosing materials. It has 50 days to decide a certificate of appropriateness application.
Can raising my roof trigger demolition review?
It can on an old house. Sharon's bylaw defines demolition as pulling down, removing or razing a building or any portion of it, and it applies to buildings 100 or more years old or of unknown age, among others. Taking off a roof structure to add a full second story on such a house is a question for the Historical Commission before you file.
Why do low-pitch roofs on Sharon ranches leak at the eaves?
Snow melts over a warm attic, refreezes at the cold overhang and backs water under the shingles. A low slope gives that water more time to find a seam. The fix is attic air sealing and insulation plus the ice barrier membrane the state residential code requires at the eaves.
Are there rebates for attic insulation when I re-roof in Sharon?
Possibly. Sharon does not have a municipal light plant, so statewide Mass Save insulation and air sealing offers may be available depending on your electric and gas accounts. Check eligibility before the roof is replaced, since attic work is easier with the old roof still in place.
Where will the dumpster go if my yard backs onto a wetland?
Not in the buffer if we can help it. Sharon's wetlands bylaw covers land within 100 feet of a resource area and a 200-foot riverfront area along streams. We stage on the driveway side and keep debris and nails out of that land.
Sources
Facts on this page were last checked against these sources on November 17, 2026.
- Town of Sharon Code, Chapter 174 Historic Preservation (eCode360) (accessed 2026-11-17)
- Town of Sharon Code, Chapter 262 Wetlands Protection (eCode360) (accessed 2026-11-17)
- Town of Sharon Code, Chapter 125 Building Construction (eCode360) (accessed 2026-11-17)
- Massachusetts DOER, Municipal Energy Code List (CSV, November 3, 2026) (accessed 2026-11-17)
- Mass.gov DPU, Massachusetts municipally-owned electric companies (accessed 2026-11-17)
- Mass Save, Insulation and air sealing (accessed 2026-11-17)
- Mass.gov, 780 CMR 10th edition residential code, Chapter 3 amendments (ice barrier underlayment) (accessed 2026-11-17)
- University of Minnesota Extension, Dealing with and preventing ice dams (accessed 2026-11-17)
- Mass.gov, HIC contractor resources (accessed 2026-11-17)
- US Census Bureau, ACS 2020 to 2024 5-year, B25034 year structure built (accessed 2026-11-17)
- US Census Bureau, ACS 2020 to 2024 5-year, B25024 units in structure (accessed 2026-11-17)