General Contractor North Andover MA: Newer Homes, an Old Center and Local Bylaws

A general contractor North Andover MA homeowners hire is working with housing that is younger than in Danvers or Lynnfield. The median home in town was built in 1979, and almost half of the housing dates from 1980 or later. That newer stock sits next to the Old Center, a local historic district with its own commission, and a demolition delay bylaw that reaches any building 100 years old or more. Add a Stretch Code that has applied since 2017 and an ADU bylaw passed in 2025, and the rules depend heavily on the address.

Where a general contractor North Andover MA projects begin

North Andover had 30,915 residents at the 2020 Census and about 12,100 housing units in the Census Bureau’s 2020 to 2024 estimates. The housing is young by local standards: the median year built is 1979, against 1963 in Danvers and 1964 in Lynnfield. About 30 percent of units were built from 1980 to 1999 and 19 percent from 2000 on. Another 26 percent date from 1960 to 1979. Only about 25 percent predate 1960, and 14 percent predate 1940.

The building types are mixed. Detached single family houses hold about 53 percent of units. Attached single family homes, such as townhouses, hold 11 percent, a high share. Buildings of five or more units hold 25 percent, and two- to four-unit buildings about 10 percent.

That mix sorts most projects into three groups. A house from the 1980s or 1990s may be ready for its first full kitchen or bath remodel, new windows or more space. Townhouse and condo owners work inside an association’s rules about exteriors, hours and shared systems. Owners of houses 100 years old or more, or of any house in the Old Center, need to check the historic district and demolition rules below.

Permits from the Building Department

Permits in North Andover are issued by the town’s Building Department. The department enforces the State Building Code, 780 CMR, the state Zoning Act and the relevant sections of the town code. It issues permits for all kinds of construction, from single and multi-family homes to pools, chimneys, signs, additions and alterations. Building officials also carry out the periodic inspections that certain buildings need for a certificate of inspection under the state code.

Electrical work is permitted and inspected by the department’s Electrical Inspector, and plumbing and gas work by its Plumbing Inspector, who also conducts the final inspection tied to a certificate of occupancy. Permit and license applications are filed online. On a kitchen or bathroom, expect a building permit plus separate plumbing and electrical permits from each licensed trade.

Rules inside the Old Center district

North Andover’s local historic district is governed by Chapter 110 of the town bylaws, cited as the North Andover Old Center Historic District Bylaw and adopted under state law, Chapter 40C. The district map is on file with the Town Clerk.

Inside the district, no building may be built or altered in a way that affects exterior architectural features until the Commission issues a certificate of appropriateness, a certificate of nonapplicability or a certificate of hardship. Applications are filed in triplicate with the Commission, the Building Inspector and the Town Clerk, with scaled plans and elevations. The Commission has 14 days to decide whether an application involves features it reviews, must give 14 days’ notice of a public hearing, and has 60 days to decide. An aggrieved party can appeal to Superior Court within 20 days.

The bylaw also lists exemptions. Paint color and roofing material are exempt, as are storm doors and windows, screens, landscaping with plants and certain ordinary maintenance and repairs. Additions and new structures that affect exterior architectural features are not on the exempt list. We ask the Commission early, because a 60-day review clock is easier to plan around than to discover.

The North Andover Historical Society describes how the Old Center grew around the town’s 17th-century meetinghouse, and how mills later developed in what is now called Machine Shop Village after the railroad bypassed the old center in 1836.

A 100-year demolition delay

Chapter 70, the demolition delay bylaw, applies to any building that is 100 years old or more, in whole or in part. A building of unknown age is assumed to be over 100. The Building Commissioner forwards the application to the Historical Commission within seven days, and the Commission has 30 days to decide whether the building is significant. If so, a public hearing follows.

If the Commission then finds the building should preferably be preserved, no demolition permit can issue for 12 months. Neither can a building permit for new construction or alterations on that property, unless the Commission agrees otherwise. That second part catches people. If an old garage turns out to be significant, a plan to replace it with an addition can stall work on the whole lot for a year.

ADUs, the Stretch Code and site rules

The Annual Town Meeting on May 13, 2025 approved a local ADU bylaw, Article 22 of that year’s warrant, following a 2023 resident survey. The 2024 state ADU law applies here too: one protected ADU per lot is allowed by right in single family districts, up to 900 square feet or half the main house’s floor area, and towns cannot require owner occupancy. See our ADU builder page.

North Andover has been on the Stretch Code since January 1, 2017. New homes, ADUs and additions are reviewed under it. Our energy code guide explains the tiers. The town code also has its own chapters on wetlands protection, stormwater management and erosion control, and a neighborhood conservation district, so larger site work gets a bylaw check alongside zoning. North Andover is on FEMA’s Essex County flood maps effective July 8, 2025.

Baths, windows, insulation and siding

For a bathroom remodel North Andover MA owners plan in a house from the 1980s or 1990s, the room may still have its original tub, tile and exhaust fan, and the fan is worth upgrading while the walls are open. See our bathroom remodeling page. Replacement windows North Andover MA homeowners ask about can be the next step on those houses. On anything built before 1978, Massachusetts requires a licensed lead-safe renovation contractor for paid work that disturbs paint, and window replacement is always covered by the federal rule. See windows and doors.

Insulation contractors North Andover MA owners call should start with an energy assessment. Mass Save offers incentives for insulation and air sealing. For fiberglass insulation North Andover MA attics, we also price blown cellulose for the same space so you can compare. Siding jobs often pair with insulation work. Insulated vinyl siding North Andover MA owners consider is vinyl with a rigid foam backing, and it can be one way to add some wall insulation during a reside. See drywall and insulation and siding.

Contracts and next steps

On an owner-occupied home of one to four units, the contractor must be a registered Home Improvement Contractor. Contracts over $1,000 must be in writing, and the deposit is capped at one third of the price or the cost of special-order materials. Check the supervisor’s Construction Supervisor License with our license guide.

For roofs, see roofing in North Andover. For other towns, see the service areas page and the Massachusetts overview. To start, contact us with the address, the year built and a few photos.

Popular projects in North Andover

North Andover neighborhoods we serve

  • Old Center

Other services in North Andover

Frequently asked questions

Who issues building permits in North Andover?

The town's Building Department. It enforces the state building code, 780 CMR, and the state Zoning Act, and it issues permits for new homes, additions, alterations, pools, chimneys and other work. Electrical, plumbing and gas permits come from the department's trade inspectors. Applications are filed online.

What needs approval in the Old Center Historic District?

Under Chapter 110 of the town bylaws, construction or alteration that affects exterior architectural features needs a certificate from the Commission before work starts. Some items are exempt, including paint color, roofing material, storm doors and windows, and landscaping with plants. The Commission decides within 14 days whether an application involves features it reviews.

My house was built in 1915. Does the demolition delay affect me?

It can, if you plan to demolish all or part of it. Chapter 70 covers buildings that are 100 years old or more, in whole or in part, and assumes a building of unknown age is over 100. If the Commission finds the building should be preserved, no demolition permit, and no building permit for new construction or alterations on the property, can issue for 12 months unless the Commission agrees otherwise.

Can I build an ADU in North Andover?

Yes. The 2024 state ADU law applies in North Andover, as everywhere outside Boston, and allows one protected ADU by right in single family districts, up to 900 square feet or half the main house's floor area, without an owner-occupancy requirement. Town Meeting approved a local ADU bylaw on May 13, 2025. Check its details against your lot before design.

Is North Andover in a flood zone?

Parts of town may be. North Andover is not a coastal community, but it is on FEMA's revised Essex County flood maps effective July 8, 2025, with Town Hall at 120 Main Street as its map repository. Look up your lot on the current map before planning an addition.

Sources

Facts on this page were last checked against these sources on November 17, 2026.

  1. US Census Bureau, 2020 Census redistricting data (PL 94-171), Massachusetts (accessed 2026-11-17)
  2. US Census Bureau, ACS 2020 to 2024 5-year estimates, Table B25034 year structure built (accessed 2026-11-17)
  3. US Census Bureau, ACS 2020 to 2024 5-year estimates, Table B25035 median year structure built (accessed 2026-11-17)
  4. US Census Bureau, ACS 2020 to 2024 5-year estimates, Table B25024 units in structure (accessed 2026-11-17)
  5. Merrimack Valley Planning Commission, 2025 annual report (accessed 2026-11-17)
  6. Massachusetts Office of Coastal Zone Management, CZM regions, coastal communities and coastal zone boundary (accessed 2026-11-17)
  7. Town of North Andover, Building Department, Wayback Machine archive of June 19, 2023 (accessed 2026-11-17)
  8. Town of North Andover Code, Chapter 110, Historic Districts (eCode360, code version 2025-05-13) (accessed 2026-11-17)
  9. Town of North Andover Code, Chapter 70, Demolition Delay (eCode360) (accessed 2026-11-17)
  10. Town of North Andover, Master Plan Implementation, Housing (ADU bylaw vote) (accessed 2026-11-17)
  11. North Andover Historical Society, Old Center (accessed 2026-11-17)
  12. Federal Register, FEMA final flood hazard determinations including Essex County, MA (effective July 8, 2025) (accessed 2026-11-17)
  13. Mass.gov (DOER), Municipal Energy Code List, CSV dated November 3, 2026 (accessed 2026-11-17)
  14. Mass.gov EOHLC, Accessory Dwelling Unit (ADU) FAQs (accessed 2026-11-17)
  15. Mass Save, Insulation and air sealing (accessed 2026-11-17)
  16. Mass.gov, Lead-safe renovation for homeowners (accessed 2026-11-17)
  17. Mass.gov, HIC contractor resources (accessed 2026-11-17)
  18. Mass.gov, Home improvement contract sample language (accessed 2026-11-17)