Two housing stocks in one city
Haverhill had 67,787 residents in the 2020 Census and is one of the 15 member communities of the Merrimack Valley Planning Commission. The Census Bureau’s 2020 to 2024 estimates count 27,892 housing units with a median year built of 1964. That median hides a split. About 37.9 percent of units predate 1940, while 25.4 percent were built between 1980 and 1999 and another 12.0 percent since 2000. The middle decades are thin: 9.2 percent from the 1940s and 1950s, 15.6 percent from 1960 to 1979.
Building types are just as mixed. Detached single family houses make up 41.0 percent, single family attached homes 10.2 percent, two-unit buildings 13.9 percent, three and four unit buildings 11.4 percent and buildings of five or more units 23.3 percent.
So one Haverhill job might be a prewar house with plaster walls and decades of patched wiring, and the next a framed house from the late 1980s. The scope, the lead rules and the likely surprises are different. We ask for the year built before we quote anything.
How contractors Haverhill MA homeowners hire handle permits
Permits are issued by the City through its Inspectional Services Department, in Room 214 at City Hall, 4 Summer Street. The department enforces building, wiring, plumbing, gas, health and environmental laws. Building, electrical and plumbing or gas permits are all filed through the City’s OpenGov online portal, which accepts credit cards and PayPal. At the counter the office takes checks or money orders payable to the City of Haverhill and does not accept cash.
The City spells out when a renovation permit is needed: interior and exterior remodeling, including kitchens, bathrooms, drywall replacement and subfloor work. Cosmetic jobs such as painting or new rugs are exempt. Plumbing, gas and electrical work need their own permits, and in Haverhill homeowners cannot do that work themselves. It has to be a licensed professional.
A few other rules shape the schedule:
- Renovation permits cost $50 for projects up to $2,000, plus $14 per additional $1,000 of value.
- Building, plumbing, gas and electrical permits last six months. A six-month extension costs $25.
- The building permit card has to be on site before the project starts.
- Contractors upload the owner contract for owner-occupied one to four family homes, plus their license, HIC registration and workers’ compensation information.
- Homeowners can pull their own building permit only for a one or two family dwelling they occupy.
Decks, sheds, fences and plot plans
Haverhill asks for a City plot plan with applications for pools, sheds, fences and decks. The plot plan comes from the Engineering Department in Room 300. A new deck needs the plot plan, a drawing of the deck and the application. Replacing only the decking boards or railings still needs a permit but skips the plot plan. Pool permits also need an electrical permit. For duplexes and condominiums, an approval letter must be attached to the application. Our decks and patios hub covers design and code.
Dumpsters and staging
Any job that fills a dumpster needs a permit for it. On your own property, that is a Board of Health permit, and the City lists a temporary dumpster permit at $15 for one month. Putting the dumpster in the street requires a street obstruction permit from Engineering. We pull these with the building permit so the container shows up on day one.
Concrete, painting and windows
Concrete contractors Haverhill MA owners call for a new foundation should know the City prices foundation, new construction and mechanical permits by contacting the office rather than by the published renovation formula. Steps, walkways and patio slabs are smaller jobs, and we confirm with the office which permits they need. See our masonry and concrete hub.
House painting services Haverhill MA homeowners book do not need a building permit, but on a house built before 1978 the lead rules apply. Massachusetts requires a licensed lead-safe renovation contractor for paid work that disturbs paint in those homes, which covers scraping and sanding. With more than a third of the city’s housing built before 1940, that is a lot of Haverhill. Our painting hub has more.
Haverhill MA replacement windows in an older house usually mean dealing with painted trim, so the same lead rules apply. In a newer subdivision house, the questions are more about the window type and whether the rough openings are sound. The windows and doors hub goes through options.
Historic review in Haverhill
The Haverhill Historical Commission is a volunteer board of seven residents. Its listed role is advising the Massachusetts Historical Commission on projects that need Section 106 or state Chapter 254 review, which are projects involving state or federal funding, licenses or permits. The state’s guidance is that a National Register listing alone does not restrict what a private owner does with private money. It typically meets at 6 p.m. on the first Wednesday of the month.
The Main Street Historic District has been on the National Register since May 9, 2003. In June 2016, the City Council voted 2 to 6 against an ordinance that would have given the Historical Commission demolition delay review over that district. The City’s historic plaque page treats all buildings 75 years or older as historic for plaque purposes, and it refers to Rocks Village as an existing historic district. If your house is in Rocks Village, ask the City what exterior review applies before you change siding, windows or a porch.
For house history, the City points owners to the public library’s Special Collections, which holds building surveys, city directories, maps and old building permit cards.
Neighborhoods and village centers
The City’s Vision Haverhill 2035 master plan update names areas including Ayers Village, Ward Hill and its industrial park, and Downtown and the Riverfront, and it refers to the Highlands neighborhood. It proposes mixed-use village center housing at eight commercial neighborhood locations, Ayers Village among them. Rocks Village appears on the City’s plaque page.
ADUs, the energy code and hiring
Haverhill has had an accessory dwelling ordinance since 1992. The City Council passed an amended version in February 2023 that kept owner occupancy and special permit requirements and allowed detached units. The 2024 state ADU law changed the ground rules: since February 2, 2025, local zoning cannot require owner occupancy or a special permit for one protected use ADU in single family zoning. Read our ADU law guide before you design one.
Haverhill has been on the Stretch Code since July 1, 2018. For hiring, the state rules apply: an owner-occupied one to four unit home needs a registered Home Improvement Contractor, and contracts over $1,000 must be in writing. For roof work, see our Haverhill roofing page. The Massachusetts overview covers statewide rules, and you can contact us with your address and the year your house was built.
Popular projects in Haverhill
Handyman Haverhill MA: Small Repairs, Rental Turnovers and City Permits
Finish carpentry, trim, built-ins, doors, stairs, rot repair and punch lists.
Learn more →Roofing Contractors Haverhill MA: Permits, Licenses and Two Generations of Roofs
Roof replacement, repair, flat roofs, slate and copper for Boston homes.
Learn more →Haverhill neighborhoods we serve
- Rocks Village
- Ayers Village
- Highlands
- Ward Hill
- Downtown and Riverfront
Other services in Haverhill
- Commercial Roofing
- Kitchen Remodeling
- Bathroom Remodeling
- Basement Finishing
- Basement Waterproofing
- Home Additions
- ADU Builder
- Siding
- Windows & Doors
- Decks & Patios
- Masonry & Concrete
- Painting
- Flooring & Tile
- Drywall & Insulation
- Whole-Home Renovation
- Design-Build
- Custom Homes
- Commercial Construction
- Gutters & Exterior Trim
Frequently asked questions
Do I need a permit to remodel a kitchen or bathroom in Haverhill?
Yes. The City says renovation permits cover interior and exterior remodeling, including kitchens, bathrooms, drywall replacement and subfloors. Painting and changing rugs do not need one. Electrical and plumbing work need their own permits, and in Haverhill that work must be done by licensed professionals.
How much is a building permit in Haverhill?
For renovation permits, the City charges $50 for projects up to $2,000, then $14 for each additional $1,000 of project value. A $5,000 job comes to $92 under the City's example. Permits last six months, and a six-month renewal is $25.
Can I pull my own permit in Haverhill?
Only for a one or two family home you occupy. Non-owner-occupied buildings and buildings with three or more units require a Massachusetts Construction Supervisor License holder. Homeowners cannot do their own plumbing or electrical work.
Does Haverhill have a demolition delay?
We have not confirmed a citywide one. In June 2016 the City Council voted 2 to 6 against an ordinance that would have given the Historical Commission demolition delay review over the National Register listed Main Street Historic District. Check with the Commission before planning a demolition.
Can I build an ADU in Haverhill?
Haverhill has had an ADU ordinance since 1992 and amended it in 2023. The 2024 state law now also protects one ADU by right in single family zoning in every municipality except Boston, and local rules that conflict with it are unenforceable. A building permit is still required.
Sources
Facts on this page were last checked against these sources on November 17, 2026.
- City of Haverhill, Building permits (accessed 2026-11-17)
- City of Haverhill, Inspections (accessed 2026-11-17)
- City of Haverhill, Historical Commission (accessed 2026-11-17)
- City of Haverhill, Historic house plaques (accessed 2026-11-17)
- City of Haverhill, City Council minutes, June 21, 2016 (accessed 2026-11-17)
- City of Haverhill, City Council minutes, February 28, 2023 (ADU ordinance) (accessed 2026-11-17)
- City of Haverhill, Vision Haverhill 2035 master plan update (2020) (accessed 2026-11-17)
- Merrimack Valley Planning Commission, 2025 annual report (accessed 2026-11-17)
- Massachusetts DOER, Municipal energy code list (CSV, November 3, 2026) (accessed 2026-11-17)
- US Census Bureau, ACS 2020 to 2024 5-year, B25034 year structure built (accessed 2026-11-17)
- US Census Bureau, ACS 2020 to 2024 5-year, B25035 median year structure built (accessed 2026-11-17)
- US Census Bureau, ACS 2020 to 2024 5-year, B25024 units in structure (accessed 2026-11-17)
- US Census Bureau, 2020 Census redistricting data (PL 94-171), Massachusetts (accessed 2026-11-17)
- Massachusetts Historical Commission, There's a difference (local historic districts and National Register districts) (accessed 2026-11-17)
- Mass.gov, Lead-safe renovation for homeowners (accessed 2026-11-17)
- Mass.gov, HIC contractor resources (accessed 2026-11-17)
- Mass.gov, ADU law, Acts of 2024 chapter 150 sections 7 and 8 (accessed 2026-11-17)
- Mass.gov EOHLC, Accessory dwelling unit FAQs (accessed 2026-11-17)