A city with many two and three family houses
Westfield had 40,834 residents at the 2020 Census, and the Census Bureau’s 2020 to 2024 estimates count about 16,830 housing units. The median year built is 1964. About 24 percent of units predate 1940, 20 percent date from 1940 to 1959, 27 percent from 1960 to 1979, and the rest are newer.
What sets Westfield apart is the building mix. Detached single family homes hold about 60 percent of units. Two-unit buildings hold about 9 percent, and three and four unit buildings another 9 percent, so close to one in five units sits in a small multi-family house. Larger buildings of five or more units hold 16 percent, and mobile homes about 3 percent. A remodel here is often in an owner-occupied two or three family house, where one unit’s kitchen sits over another unit’s ceiling and the tenants often stay home during the work.
What a home remodeling contractor Westfield MA permits involve
Permits in Westfield are issued by the city through the Building Department at City Hall, 59 Court Street. The department’s FAQ, as archived in 2023, spells out what needs a permit. Any work that constructs, alters, repairs, removes or demolishes a structure does, and so does cutting into a wall, removing a beam or changing a means of egress. It names roofing, windows and siding specifically. Roofing contractors Westfield MA homeowners hire should pull a permit for a reroof.
The same FAQ lists what is exempt from a building permit: one-story sheds up to 120 square feet, fences up to 7 feet, retaining walls up to 4 feet, and finish work like painting, tiling, carpeting, cabinets and countertops, though a plumbing permit may still apply. The department’s permit page offers separate forms for residential building, residential additions, demolition, zoning and certificates of inspection, with separate residential and commercial fee schedules.
At that time, applications were on paper and could be mailed, dropped off at City Hall or left in the after-hours drop box at the entrance. Fees were paid by check or money order only. The submittal list is long, and we assemble it before filing:
- The completed application, signed by all parties, and the fee
- A workers compensation affidavit and a certificate of liability insurance
- Copies of the contractor’s Construction Supervisor License and Home Improvement Contractor registration
- A homeowner exemption form if the owner does the work, and a demolition debris form
- Two sets of plans if digital copies are not provided, plus any asbestos testing the scope calls for
- Recorded approvals from any board, such as a special permit or variance, with every condition met
New construction needs a plot plan drawn by a Massachusetts licensed land surveyor. Additions and accessory structures may use a hand-drawn plot plan, though the department can require a survey if zoning compliance is in question.
Historic review under Ordinance 1352
Westfield’s Historical Commission dates to 1963, and its members are appointed by the Mayor. It meets on the fourth Monday of each month at 6 p.m. at City Hall. Its main tool is Ordinance 1352, the demolition delay ordinance adopted in 2003 and amended in 2008.
The ordinance does not use an age cutoff. It applies to buildings on the National Register, the State Register, the Commission’s own Westfield register, or inside a local historic district. Placing a property on the city register takes a two-thirds vote of the full Commission after an open meeting the owner is invited to. Demolition is defined to include razing any exterior portion of a building, so removing a porch or wing on a listed building counts.
Before anyone can apply for a demolition permit on a listed building, the owner files with the City Clerk for a Certificate of Historical Review, with a $60 fee and a list of abutters, including properties across the street. The Commission holds a hearing within 45 days to discuss alternatives. Either it issues the certificate within 90 days, or the City Clerk certifies that 90 days have passed. That is a short hold, but it still belongs in the schedule.
Flood maps, energy code and the city’s utility
FEMA’s final flood hazard determination for Hampden County, which lists the City of Westfield, took effect July 16, 2013. Lots near a mapped flood zone should be checked against the current map before an addition or a finished basement is planned.
Westfield has been on the Stretch Code since January 1, 2017, which sets the energy rules for new homes and large additions. See our energy code guide. The city’s electricity comes from Westfield Gas and Electric Light Department, a municipal light plant. That matters for anyone talking to heat pump contractors Westfield MA residents find online: Mass Save electric offers may not apply, so ask the department what it offers before choosing equipment.
The 2024 state ADU law applies in Westfield as it does everywhere outside Boston. Read our ADU law guide.
Lead paint, contracts and next steps
About 72 percent of Westfield’s housing predates 1980. Paid work that disturbs paint in a pre-1978 home needs a licensed lead-safe renovator. In a two or three family house, plan the work so other units are protected too. See our lead paint law guide.
Any home improvement contract over $1,000 must be in writing, and the deposit is capped at one third of the price or the cost of special-order materials. Our license guide shows how to check a contractor.
See our kitchen remodeling hub, whole home renovation hub, the service areas page and the Massachusetts overview. To start, contact us with your address, the number of units in the building and a few photos.
Other services in Westfield
- Roofing
- Commercial Roofing
- Kitchen Remodeling
- Bathroom Remodeling
- Basement Finishing
- Basement Waterproofing
- Home Additions
- ADU Builder
- Siding
- Windows & Doors
- Decks & Patios
- Masonry & Concrete
- Painting
- Flooring & Tile
- Carpentry & Repairs
- Drywall & Insulation
- Whole-Home Renovation
- Design-Build
- Custom Homes
- Commercial Construction
- Gutters & Exterior Trim
Frequently asked questions
Who issues building permits in Westfield?
Permits are issued by the city through the Building Department at City Hall, 59 Court Street. The department's FAQ, as archived in 2023, says applications could be mailed, dropped off at City Hall or left in an after-hours drop box at the entrance, with fees paid by check or money order.
Do I need a permit to replace windows or a roof in Westfield?
Yes. The Building Department's FAQ lists roofing, windows and siding among the work that needs a building permit, along with solid fuel appliances, tents and signs. Painting, tiling, carpeting, cabinets and countertops are exempt from a building permit, though a plumbing permit may still apply.
What is Westfield's demolition delay?
Ordinance 1352 covers buildings on the National or State Register, on the Westfield Historical Commission's own register, or in a local historic district. Before a demolition permit, the owner files with the City Clerk for a Certificate of Historical Review, with a $60 fee. The Commission holds a hearing within 45 days, and the review cannot hold up the permit more than 90 days from filing.
Can I get rebates for a heat pump in Westfield?
Check with your utilities first. Westfield's electricity comes from Westfield Gas and Electric Light Department, a municipal light plant, so Mass Save electric offers may not apply. Ask the department what it offers before you choose equipment.
Can I add an ADU in Westfield?
The 2024 state ADU law applies in Westfield as it does everywhere outside Boston, and it limits what cities can require for one protected ADU per lot. The city's zoning ordinance has its own ADU section, so confirm the current text with the city before design.
Sources
Facts on this page were last checked against these sources on November 17, 2026.
- US Census Bureau, 2020 Census redistricting data (PL 94-171), Massachusetts (accessed 2026-11-17)
- US Census Bureau, ACS 2020 to 2024 5-year estimates, Table B25034 year structure built (accessed 2026-11-17)
- US Census Bureau, ACS 2020 to 2024 5-year estimates, Table B25035 median year structure built (accessed 2026-11-17)
- US Census Bureau, ACS 2020 to 2024 5-year estimates, Table B25024 units in structure (accessed 2026-11-17)
- Massachusetts Office of Coastal Zone Management, CZM regions, coastal communities and coastal zone boundary (accessed 2026-11-17)
- City of Westfield, Building Department Frequently Asked Questions, Wayback Machine archive of August 1, 2023 (accessed 2026-11-17)
- City of Westfield, Building Department Permit Applications and Fees, Wayback Machine archive of August 1, 2023 (accessed 2026-11-17)
- City of Westfield, Demolition Delay Ordinance (Ordinance 1352), Wayback Machine archive of August 1, 2023 (accessed 2026-11-17)
- City of Westfield, Historical Commission, Wayback Machine archive of October 6, 2025 (accessed 2026-11-17)
- Federal Register, FEMA final flood hazard determinations, Hampden County, MA (effective July 16, 2013) (accessed 2026-11-17)
- Mass.gov (DPU), Massachusetts municipally-owned electric companies (accessed 2026-11-17)
- Mass.gov (DOER), Municipal Energy Code List, CSV dated November 3, 2026 (accessed 2026-11-17)
- Mass.gov EOHLC, Accessory Dwelling Unit (ADU) FAQs (accessed 2026-11-17)
- Mass.gov, Lead-safe renovation for homeowners (accessed 2026-11-17)
- Mass.gov, Home improvement contract sample language (accessed 2026-11-17)