Marshfield’s housing at a glance
Marshfield had 25,825 residents at the 2020 Census. Census estimates for 2020 to 2024 count about 11,800 housing units with a median year built of 1968. The age spread is broad rather than old: 13.3 percent before 1940, 27.1 percent from 1940 to 1959, 26 percent from 1960 to 1979, 19.9 percent from 1980 to 1999 and 13.8 percent since 2000.
Detached single family houses hold 79.8 percent of units. Buildings with five or more units hold 11.3 percent, a larger share than in many South Shore towns, and three or four unit buildings another 3.2 percent. That mix shows up in our work as plenty of postwar ranches and capes, a smaller run of older farmhouses and village homes, and a steady stream of condo and small multi-family repairs.
Four town rules a general contractor Marshfield MA owners hire should know
Marshfield’s code is detailed, and four parts of it come up on ordinary residential jobs.
The floodplain permit
The zoning bylaw makes every special flood hazard area on the Plymouth County flood map dated July 6, 2021 into a Floodplain Overlay District, covering Zones A, AE, AH, AO, A99, V and VE. Inside it, the town requires a floodplain permit for nearly any development: new construction, changes to existing buildings, sheds, fences, storage, paving and any filling or removal of earth.
The application goes to the Building Commissioner, who is also the town’s Floodplain Administrator. It has to show the elevation of the lowest floor, including basements, for existing and proposed structures, and a FEMA elevation certificate can satisfy that. It also needs a site plan from a registered land surveyor with the flood zone marked. In V zones, new construction has to be landward of mean high tide and dune alteration that could raise flood damage is prohibited. For new and elevated buildings, the owner signs and records a nonconversion agreement promising the enclosed space below the design flood elevation stays unfinished and used only for parking, storage or access.
Wetland buffers
Marshfield has its own Wetlands Protection Bylaw, Chapter 294, and the Conservation Commission’s regulations in Chapter 505 put numbers on the 100-foot buffer zone:
- Undisturbed, naturally vegetated buffer: structures stay 75 feet from the resource area, and landscaping or clearing stays 50 feet back.
- Buffer developed after June 20, 2002: a 50-foot setback for structures and landscaping.
- Lots developed before June 20, 2002: new structures meet a 25-foot setback to the extent possible, and never sit closer than existing buildings.
Work inside those setbacks needs a Mitigation Permit. This rule shapes backyard deck installation Marshfield MA owners ask about more than any other, because a deck on a marsh-side lot is a structure in the buffer.
Demolition review
Chapter 118, adopted in 2008, covers buildings 75 years or older that the Historical Commission finds significant, along with registered properties and buildings within 200 feet of a historic district boundary. The Building Commissioner forwards a demolition application within seven days. The commission decides significance within 30 days, the owner then has 60 days to file a demolition plan, and a public hearing follows. If the commission finds the building should preferably be preserved, the demolition permit waits 12 months. Demolishing without following the bylaw blocks building permits on the lot for three years, and an approved demolition has to be completed within two years.
Septic capacity for ADUs
The 2024 state law allows one accessory dwelling unit by right in single family zoning outside Boston. In Marshfield, the Board of Health added section 645-3.1 on March 10, 2025. If the house is not on town sewer, an approved inspector or soil evaluator first certifies the existing septic system. The ADU then needs its own two-compartment 1,500-gallon tank, and its own leaching system sized for two bedrooms when the existing field cannot take the extra flow. No one moves in until the Board of Health issues a certificate of compliance. In the Water Resource Protection District, total bedrooms on the lot are capped at one per 10,000 square feet.
Brant Rock
The zoning bylaw describes the Village of Brant Rock as having a historic pattern of commercial and residential uses in the same building, and a problem with chronic flooding. The Brant Rock Village Overlay, laid over the Business Waterfront district, allows mixed-use buildings by Planning Board special permit if the whole building is floodproofed above base flood elevation. Pilings are screened with moisture and rot resistant breakaway panels, residential parking sits above base flood elevation, and the design follows traditional New England coastal village architecture.
What we build in Marshfield
Typical projects include roof replacements, siding and Marshfield MA replacement windows on 1950s to 1970s houses, kitchens and baths, and home additions Marshfield MA families need when a ranch gets too small. We also handle decks and ADUs. Each of those starts with the flood map and a wetlands check on the plot plan.
Marshfield adopted the Stretch Code effective July 1, 2015, according to the DOER list dated November 3, 2026, and the town code carries its own Stretch Energy Code chapter. Any rebate depends on the customer’s utility and current program rules, so check before counting on one. Our Mass Save rebates guide explains how the programs work.
A home improvement contract over $1,000 has to be in writing, and ours lists the scope, price, schedule and permits.
See our home additions, decks and patios, roofing and ADU builder services, or read the state ADU law guide. We also work in Duxbury, Pembroke and Scituate. Browse all areas or contact us with your Marshfield address.
Popular projects in Marshfield
Marshfield neighborhoods we serve
- Brant Rock
Other services in Marshfield
- Roofing
- Commercial Roofing
- Kitchen Remodeling
- Bathroom Remodeling
- Basement Waterproofing
- Home Additions
- ADU Builder
- Siding
- Windows & Doors
- Decks & Patios
- Masonry & Concrete
- Painting
- Flooring & Tile
- Carpentry & Repairs
- Drywall & Insulation
- Whole-Home Renovation
- Design-Build
- Custom Homes
- Commercial Construction
- Gutters & Exterior Trim
Frequently asked questions
Who issues building and floodplain permits in Marshfield?
The Building Commissioner, who is also the town's designated Floodplain Administrator under the zoning bylaw. Floodplain permit applications go to the Building Commissioner with elevation data, which can be a FEMA elevation certificate, and a surveyed site plan.
How close to a wetland can I build a deck or addition in Marshfield?
Under the Conservation Commission's local regulations, the buffer zone runs 100 feet from a resource area. Structures generally keep 75 feet back where the buffer is naturally vegetated, 50 feet where it was developed after June 20, 2002, and 25 feet where possible on lots built before that date, never closer than the existing buildings. Closer work needs a Mitigation Permit.
Can I tear down an old Marshfield house?
Possibly, after review. If the Historical Commission finds a building 75 years or older historically significant and later decides it should preferably be preserved, the demolition permit waits 12 months. Demolishing without following the bylaw blocks building permits on the lot for three years.
What does an accessory dwelling unit need from the Board of Health?
If the house is not on town sewer, a DEP-approved inspector or soil evaluator certifies the existing septic system first. The ADU needs its own two-compartment 1,500-gallon tank, plus its own leaching field sized for two bedrooms if the existing field cannot take the flow, and it cannot be occupied until the Board of Health signs off.
Do I need a special permit to build in Brant Rock?
Not for most single family work. The Brant Rock Village Overlay adds an option, by Planning Board special permit, for mixed-use buildings floodproofed above base flood elevation. Ordinary homes there still follow the underlying zoning and the floodplain rules.
Sources
Facts on this page were last checked against these sources on November 17, 2026.
- Town of Marshfield Code, Chapter 305 Article XV, Floodplain Zoning (eCode360) (accessed 2026-11-17)
- Town of Marshfield Code, Chapter 118, Demolition of Historically Significant Buildings or Structures (eCode360) (accessed 2026-11-17)
- Town of Marshfield Code, Chapter 505 section 505-206.1, Buffer zone regulations (eCode360) (accessed 2026-11-17)
- Town of Marshfield Code, Chapter 645 section 645-3.1, Sanitary sewage requirements for accessory dwelling units (eCode360) (accessed 2026-11-17)
- Town of Marshfield Code, section 305-13.05, Brant Rock Village Overlay District (eCode360) (accessed 2026-11-17)
- Federal Register, FEMA final flood hazard determinations, Plymouth County MA (All Jurisdictions), FIRM date July 6, 2021 (accessed 2026-11-17)
- US Census Bureau, 2020 Census Redistricting Data (PL 94-171), Massachusetts (accessed 2026-11-17)
- US Census Bureau, ACS 2020 to 2024 5-year, B25034 Year structure built (accessed 2026-11-17)
- US Census Bureau, ACS 2020 to 2024 5-year, B25035 Median year structure built (accessed 2026-11-17)
- US Census Bureau, ACS 2020 to 2024 5-year, B25024 Units in structure (accessed 2026-11-17)
- Mass.gov (DOER), Municipal Energy Code List, CSV dated November 3, 2026 (accessed 2026-11-17)
- Massachusetts Office of Coastal Zone Management, CZM regions, coastal communities and coastal zone boundary (accessed 2026-11-17)
- Mass.gov EOHLC, Accessory dwelling unit FAQs (accessed 2026-11-17)
- Mass.gov, Home improvement contract sample language (accessed 2026-11-17)