General Contractor Carver MA: Remodels, Additions and ADUs

Hiring a general contractor Carver MA homeowners can depend on starts with patience at the permit counter. Carver's Building Department does not take permits online and warns that a building permit can take up to 30 days. The town also runs two local historic districts, a demolition delay for buildings a century old, and a wetlands bylaw that counts cranberry bogs as resource areas. Its housing is younger than most of the region, and almost one unit in five is a mobile home.

A younger town for a general contractor Carver MA owners hire

Carver is an inland town of 11,645 people, by the 2020 Census count, and its housing is fairly young. The Census Bureau’s 2020 to 2024 estimates show 5,064 housing units with a median build year of 1980. Only 4.9 percent predate 1940, and 8.9 percent date from the 1940s and 1950s. The big waves came later: 37.5 percent in the 1960s and 1970s, 35.3 percent from 1980 to 1999, and 13.4 percent from 2000 on.

The building types are unusual too. Detached houses are 74.2 percent of units, but mobile homes make up 19.3 percent, close to one unit in five. Attached houses, two-unit buildings and small apartment buildings together are only about 6 percent.

So a typical Carver project is a 1970s or 1980s house that is ready for its second kitchen, its second set of windows or a bigger family room. About half the housing predates 1980, which is enough that we still check paint age and plan lead-safe work on older houses. For a mobile home, we confirm with the town what a given alteration requires before quoting it.

Permits on paper, and on a 30 day clock

Carver’s Building Department page, as archived in February 2025, is direct about how it works. It does not offer online permitting. Applications are filed with the office, and the department warns that building permits can take up to 30 days depending on how busy it is. The page lists jobs that people sometimes forget need a permit: sheds, decks, pools and hot tubs, basement finishing and re-roofing.

Inspections are requested by phone at 508-866-3450 and usually take place after 12:30 pm. Wiring and plumbing inspections are booked with those inspectors directly, not through the building office. The department also keeps the zoning and flood maps, which makes it the first stop for questions about a lot.

Because of the 30 day window, we file Carver permits as soon as the drawings and contract are final, and we do not set a start date until the permit is in hand. We have not confirmed the current fee schedule, so permit fees appear on our estimates at whatever the town charges at filing.

Lakenham, Savery and the historic district commission

Carver has two local historic districts under Chapter 166 of its code:

  • Lakenham Historic District covers about 75 acres along roughly a mile of Plymouth Street, Route 44, from Gates Street past Lakenham Green to Route 58, plus about 400 feet of Main Street. Its map is dated April 1980.
  • Savery Historic District runs along both sides of Main Street, Route 58, from about 100 meters south of Meadow Street to Shaw Road. Review there is limited to features visible from Main Street, Savery Avenue and Union Cemetery.

Inside either district, a certificate from the Historic District Commission is needed before the building inspector can issue a permit for exterior changes. Several things are exempt, including paint color, roofing in a uniform color, storm doors, at-grade walks and drives, and in-kind rebuilding after a fire or storm. Since the April 2016 Town Meeting the same commission also acts as the town’s Historical Commission and holds the duties of the Lakenham Green Preservation Committee and the Marcus Atwood House trustees.

Demolition delay at 100 years

Outside the districts, Article II of Chapter 166 covers demolition of buildings that are 100 years old or more, in whole or in part. A building of unknown age is presumed to be over 100. The Building Commissioner forwards the application within 7 days, the commission decides on significance within 15 days, and a hearing follows within 30 days with posted notice. If the building is found preferably preserved, no demolition permit issues for six months.

The penalties are steep. Demolishing a covered building without a permit can draw a fine of up to $300 a day, and no building permit can issue for that parcel, or adjoining parcels with the same owner, for two years. With under 5 percent of Carver’s housing older than 1940, this rule will not touch most projects, but when it does it matters.

Bogs, wetlands and the 65 foot line

Carver’s wetlands bylaw, Chapter 281, was amended in 2023 and again in April 2025. It gives the Conservation Commission jurisdiction within 100 feet of any bank, wetland, marsh, swamp, bog, cranberry bog, beach, wet meadow, pond or lake, land subject to flooding or the 100 year floodplain, and within 200 feet of each side of a perennial river or stream.

The rule that shapes site plans is the 65 foot line. Building or enlarging any structure, parking area or impervious surface within 65 feet of wetlands, banks and bordering land needs a variance from the commission on top of the permit or order of conditions. On a lot that backs onto a bog, an addition or a detached garage can end up somewhere other than where you first pictured it.

Carver is not a coastal community, but it does have mapped flood areas. Its Floodplain District follows the Plymouth County flood maps dated July 6, 2021, and FEMA’s notice for those maps lists the town. The zoning bylaw also has a Water Resource Protection District and a Wetland District among its overlays.

ADUs, energy code and next steps

Carver amended its accessory apartment section twice in 2025, and one ADU is now allowed by right on a single family lot in several districts. The details, from size limits to the 12 foot emergency driveway for a detached unit, are on our Carver ADU contractor page.

The state DOER list shows Carver on the Stretch Code since July 1, 2019, so new homes and additions follow the stretch requirements. Carver is not served by a municipal light plant, and Mass Save programs may be available depending on your utility. See our Mass Save guide.

For an owner-occupied home of one to four units, hire a registered Home Improvement Contractor and put any contract over $1,000 in writing. Our home additions service and kitchen remodeling service explain how those projects run. Then contact us with the address and the year the house was built. The Massachusetts overview and service areas cover the rest.

Popular projects in Carver

Other services in Carver

Frequently asked questions

Can I apply for a Carver building permit online?

No. The Building Department's page states that it does not offer online permitting, and it warns that building permits can take up to 30 days depending on volume. Inspections are requested by phone at 508-866-3450 and usually happen after 12:30 pm. Wiring and plumbing inspections are scheduled with those inspectors directly.

Which projects need a permit in Carver?

The department lists sheds, decks, pools and hot tubs, basement finishing and re-roofing among the jobs that need permits, along with the usual additions, alterations and new houses. Electrical and plumbing work have their own permits and inspectors.

Is my house in a Carver historic district?

Check two areas. The Lakenham Historic District covers about 75 acres along roughly a mile of Plymouth Street, Route 44, past Lakenham Green, plus part of Main Street. The Savery Historic District covers both sides of Main Street, Route 58, from near Meadow Street to Shaw Road. In either one, visible exterior changes need a Historic District Commission certificate before the building permit.

Can I build near a cranberry bog in Carver?

Carefully. Chapter 281 gives the Conservation Commission jurisdiction within 100 feet of any bog, including cranberry bogs, and other wetlands, and within 200 feet of perennial rivers and streams. Building or enlarging a structure, parking area or other impervious surface within 65 feet needs a variance from the commission as well as a permit.

Can I add an ADU in Carver?

Yes. Zoning section 290-2-2.6, amended in April and October 2025, allows one accessory apartment per lot by right, up to half the main house's gross floor area or 900 square feet, whichever is smaller. Our Carver ADU page covers the details.

Sources

Facts on this page were last checked against these sources on November 17, 2026.

  1. Town of Carver, Building Department (Wayback Machine archive, February 22, 2025) (accessed 2026-11-17)
  2. Town of Carver Code, Chapter 166, Historic Districts (eCode360) (accessed 2026-11-17)
  3. Town of Carver Code, Chapter 166, Article II Demolition Delay, section 166-11 Procedure (eCode360) (accessed 2026-11-17)
  4. Town of Carver Code, Chapter 281, Wetlands (eCode360) (accessed 2026-11-17)
  5. Town of Carver Zoning, section 290-3-9.3, Floodplain District (eCode360) (accessed 2026-11-17)
  6. Town of Carver Zoning, section 290-2-2.6, Accessory Apartments (eCode360) (accessed 2026-11-17)
  7. Town of Carver Zoning, establishment of districts (eCode360) (accessed 2026-11-17)
  8. Federal Register, FEMA final flood hazard determinations, Bristol and Plymouth Counties MA (FEMA-B-1842), FIRM date July 6, 2021 (accessed 2026-11-17)
  9. SRPEDD, 2025 Annual Report (accessed 2026-11-17)
  10. US Census Bureau, 2020 Census redistricting data (PL 94-171), Massachusetts (accessed 2026-11-17)
  11. US Census Bureau, ACS 2020 to 2024 5-year, B25034 year structure built (accessed 2026-11-17)
  12. US Census Bureau, ACS 2020 to 2024 5-year, B25035 median year structure built (accessed 2026-11-17)
  13. US Census Bureau, ACS 2020 to 2024 5-year, B25024 units in structure (accessed 2026-11-17)
  14. Massachusetts DOER, Municipal Energy Code List (CSV, November 3, 2026) (accessed 2026-11-17)
  15. Massachusetts Office of Coastal Zone Management, CZM regions, coastal communities and coastal zone boundary (accessed 2026-11-17)
  16. Mass.gov DPU, Massachusetts municipally owned electric companies (accessed 2026-11-17)
  17. Mass.gov, HIC contractor resources (accessed 2026-11-17)
  18. Mass.gov, Lead-safe renovation for contractors (accessed 2026-11-17)

Planning a project in Carver?

Free, no-pressure estimates in Boston and across Massachusetts.