Your building permit comes from the local building official in your city or town, but the code behind it is statewide: 780 CMR applies to every building and structure in Massachusetts. Since June 30, 2025 that has meant the 10th edition, which is built on modified 2021 International Codes, with a Massachusetts residential chapter based on the 2021 International Residential Code. Energy rules are the main exception to statewide uniformity. The state treats the 10th edition as a base energy code, and the Department of Energy Resources adopts stretch and specialized stretch codes. The state tells you to check with your municipality to see whether one of those applies, so the energy rules can differ from one town to the next.
Can a homeowner pull a building permit in Massachusetts? The exemption explained
The rule sits in the construction supervisor licensing section of the code, 780 CMR 110.R5. Normally, anyone supervising construction, alteration, repair or demolition regulated by the code must hold a Construction Supervisor License. The exception says a homeowner performing work that needs a building permit is exempt from those licensing provisions. There is a condition attached: if the homeowner hires people to do the work, the homeowner acts as the supervisor.
On the application itself, the base code says the owner or an authorized agent files the permit application and signs it. So the paperwork side is open to owners in general. The licensing exemption is narrower.
Who qualifies as a homeowner
The code defines a homeowner as a person who owns a parcel of land where he or she lives or intends to live, and on which there is, or will be, a one or two family dwelling, accessory structures to that use, or farm structures. One more sentence closes the obvious loophole: someone who builds more than one home in a two-year period is not considered a homeowner.
In practice that leaves out several common situations:
- a three-family or larger building, even if you live in one unit
- a condo unit in a building with three or more homes (Boston spells this out and requires a hired contractor)
- a rental or investment property you do not live in and do not plan to
- a builder doing a series of houses and calling each one “my home”
Mass.gov’s own summary of when a CSL is required points back to the homeowner exemption language in the code for one and two family homes and for existing owner-occupied homes of one to four units, and tells you to check with the local building official for any added local requirements.
What you take on when you pull the permit
The exemption removes the licensing requirement. It does not remove the code. The work still has to meet 780 CMR, and when you hire help under the exemption, the code makes you their supervisor.
The code does keep a licensed contractor on the hook. A licensed construction supervisor who contracts to do work for a homeowner is responsible for doing it to the code and to the manufacturer’s recommendations, whether or not that supervisor secured the permit. But that responsibility to the code is different from the consumer protections in the next section, and those are what homeowners usually give up.
The Guaranty Fund problem
Home improvement work on an existing owner-occupied home with one to four units is covered by the Home Improvement Contractor law, chapter 142A. Its last-resort protection is the Guaranty Fund, which pays eligible homeowners up to $25,000 of actual loss when a contractor does not pay a court judgment or arbitration award. One of the eligibility conditions is that the contractor, not the homeowner, secured the building permit.
The Office of Consumer Affairs and Business Regulation puts it bluntly in its sample contract guidance: homeowners who secure their own building permits are automatically excluded from the Guaranty Fund provisions of the law. Every required home improvement contract has to include a clause telling the owner exactly that. You may still qualify for the state’s arbitration program, since arbitration does not require that the contractor pulled the permit, but if you win and the contractor never pays, the fund is not there behind you.
Using an unregistered contractor costs you more. The state says that if you hire an unregistered contractor, you cannot use OCABR arbitration or the Guaranty Fund at all, although you can still file a complaint and go to court. Massachusetts building permits are required to state that people contracting with unregistered contractors do not have access to the Guaranty Fund. The state also notes that a contractor who refuses to apply for the permit may be unregistered. If you want to check a company before deciding who pulls the permit, our MA home improvement contractor lookup guide walks through it, and our construction supervisor license guide covers the license search.
When pulling your own permit makes sense
The exemption fits the homeowner who is really doing the work: building a small deck themselves, finishing part of a basement with a friend, or replacing their own windows. In those cases there is no home improvement contractor whose failure the Guaranty Fund would cover anyway, and the HIC law does not apply to do-it-yourself homeowners working on their own homes.
It fits poorly when a company is doing most of the job and suggests you pull the permit. Then you carry the supervisor role and lose the fund, while the company does the work.
When a building permit is required
The most practical homeowner reference is the job chart published by the Office of Consumer Affairs and Business Regulation, which marks for each job type whether a CSL, an HIC registration and a building permit are needed. The state labels it general guidance, because the answer depends on project specifics and the building official has the final word. Some entries:
| Job | Building permit? | Notes from the state chart |
|---|---|---|
| Decks | Yes | CSL and HIC also required |
| New or replacement roofing | Yes | Roofing CSL minimum |
| Minor roof repairs | Maybe | Permit needed unless the building official treats it as an ordinary repair |
| Window installation or replacement | Yes | Window and siding CSL minimum |
| Door replacement | Maybe | Required for an exit door or public safety concerns |
| Siding, insulation, sheetrock | Yes | CSL and HIC also required |
| Structural carpentry or flooring | Yes | CSL and HIC also required |
| Finish flooring, carpet, tile | Maybe | Permit if a fire resistance rating applies in three and four family homes |
| Kitchen cabinets and shelving | No | May need a permit if part of a larger project |
| Fencing | Maybe | No permit or CSL if under seven feet high |
| Retaining walls | Maybe | Permit and CSL if over four feet high |
| Above-ground pools | Yes | No CSL or HIC required |
| Interior painting, patios, driveways | No | Check local zoning for driveways |
Plumbing, wiring, gas, central heating and air conditioning are handled by licensed trades under their own permits. The chart adds that plumbing and wiring work that cuts or notches building elements also needs a building permit and a CSL.
Do I need a permit for a shed?
The state chart says a shed needs a building permit and a CSL if its floor area is more than 200 square feet on a one or two family home lot, or more than 120 square feet on other lots. Below that, the building permit may not be required, but local zoning can still control where a shed goes and how close it sits to the lot line, so call your building or zoning office before you order one.
How long a building permit is good for
Massachusetts uses a 180-day clock under 780 CMR 105.5. A permit becomes invalid if the work it authorizes has not started within 180 days of issuance, or if work stops, through suspension or abandonment, for 180 days after it started. The building official can extend it in writing, one or more times, for up to 180 days each. You have to ask in writing before the 180 days run out and show justifiable cause.
There is a similar clock before the permit even issues. Under 105.3.2, an application is treated as abandoned 180 days after filing unless it has been pursued in good faith or a permit has been issued, and the building official can grant extensions of up to 90 days each. Boston states its own version on the permit pages: work must start within six months of issuance.
What a permit costs
Fees are local. The state code’s fee section says that for municipal building permit fees, you refer to the municipality. So the cost of a permit for the same project can differ from one town to the next.
Boston is a useful example of how a fee schedule works. The Short Form permit, for minor work that does not change structure or use, costs $20 plus $10 for each $1,000 of estimated cost. The Long Form, for work that changes structure or use, costs $50 plus $10 per $1,000. Boston also warns that starting work before the permit is issued can mean paying double. Our Boston building permits guide covers the City’s process in detail.
The paperwork homeowners usually file
Forms differ by town. Boston’s homeowner and Long Form lists give a good idea of what to expect:
- the permit application, signed by the owner or authorized agent
- a homeowner exemption affidavit or waiver, which Boston calls a Homeowner Waiver
- a Massachusetts workers’ compensation affidavit (Boston asks homeowners doing their own work to select Box 3)
- drawings, and for larger jobs plans stamped by a registered architect or engineer and a certified plot plan, as Boston requires for Long Form work
If a home improvement contractor is involved, the application should list the contractor’s HIC registration number, which the code calls for under 105.3. After issuance, the permit card has to stay posted at the job site until the work is complete.
Are permits public records?
Practice varies by town, so the dependable answer is to ask the building department. Boston shows what is possible: an online document image search of historical permits by address, in-person viewing of building plans at Inspectional Services, and a dataset of approved building permits issued after December 15, 2009 on the City’s open data portal. If you are buying a house and want to know whether a past basement finishing job or an addition was permitted, those records are the place to look.
When a permit is refused
If a permit is refused because the plans do not meet zoning, the next step is an appeal. In Boston you have 45 days from the refusal letter to appeal to the Zoning Board of Appeal, and the City notes you may bring a lawyer, architect or other professional to the hearing. If you are weighing whether to bring in a construction permit attorney (Boston, MA or elsewhere), the appeal hearing is the step where the City explicitly allows professional help.
The bottom line on pulling your own permit
If you live in a one or two family home and are truly doing the work yourself, the homeowner exemption is a legitimate path. If a contractor is doing the work, let the registered contractor pull the permit so the Guaranty Fund stays available. Not sure which applies to your project? Send us the details and we can talk through who should be on the permit.
This guide is general information for homeowners, not legal advice. Rules change and vary by city or town. Confirm details with your local building department or the state agency listed in the sources.
Common questions
Can a homeowner pull a permit for a contractor in Massachusetts?
The homeowner exemption lets you pull the permit and hire people, but then you act as the supervisor. If the people you hire are a home improvement contractor working on your home, you lose Guaranty Fund eligibility because the contractor did not secure the permit. You may still be eligible for state arbitration.
How long is a building permit good for in Massachusetts?
Under 780 CMR 105.5, a permit becomes invalid if work is not started within 180 days of issuance, or if work is suspended or abandoned for 180 days after it starts. You can ask the building official in writing, before the 180 days run out and with justifiable cause, for extensions of up to 180 days each.
How much is a building permit in Massachusetts?
There is no single statewide number. The building code says to refer to the municipality for municipal building permit fees. In Boston, a Short Form permit costs $20 plus $10 per $1,000 of estimated work, and a Long Form costs $50 plus $10 per $1,000.
Do I need a permit for a shed in Massachusetts?
The state's general guidance says a building permit and a construction supervisor are required for a shed with more than 200 square feet of floor area on a one or two family home lot, and more than 120 square feet on other lots. Smaller sheds may not need a building permit, but check local zoning and your building department.
Are building permits public record in Massachusetts?
Practice varies by town, so ask your building department. Boston, for one, offers an online document image search of historical permits by address and publishes approved building permits issued since December 15, 2009 on its open data portal.
Do I need a workers' compensation affidavit as a homeowner?
Ask your building department, since forms vary by town. Boston, for example, asks homeowners doing their own work to file one with Box 3 selected, along with a Homeowner Waiver.
Sources
Facts on this page were last checked against these sources on November 16, 2026.
- 780 CMR 110.R5, Licensing of construction supervisors, homeowner exemption and definition (eff. 10/11/2024, via Cornell LII) (accessed 2026-11-16)
- 780 CMR 105.5, Expiration of permits (eff. 10/11/2024, via Cornell LII) (accessed 2026-11-16)
- 780 CMR 105.3, Application for permit (eff. 10/11/2024, via Cornell LII) (accessed 2026-11-16)
- 780 CMR 109.2, Fee schedule (eff. 10/11/2024, via Cornell LII) (accessed 2026-11-16)
- Mass.gov, Tenth edition of the MA State Building Code 780 (accessed 2026-11-16)
- Mass.gov, When is a Construction Supervisor License required? (accessed 2026-11-16)
- Mass.gov, HIC Contractor Resources (CSL, HIC and building permit chart) (accessed 2026-11-16)
- Mass.gov, HIC Homeowner Resources (accessed 2026-11-16)
- Mass.gov, Home Improvement Contract Sample Language (accessed 2026-11-16)
- Mass.gov, Request Arbitration to Resolve a Conflict (accessed 2026-11-16)
- Mass.gov, File a Guaranty Fund Claim for an Unpaid HIC Judgment (accessed 2026-11-16)
- City of Boston, How to get a Short Form permit (accessed 2026-11-16)
- City of Boston, How to get a Long Form permit (accessed 2026-11-16)
- City of Boston, How to find historical permit records (accessed 2026-11-16)
- City of Boston, How to file an appeal with the Zoning Board (accessed 2026-11-16)